flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Libeskind wins competition to design Canadian National Holocaust Monument

Libeskind wins competition to design Canadian National Holocaust Monument

The plan came out ahead of David Adjaye and four others in the competition.


By BD+C Staff | May 13, 2014
Renderings: courtesy the Department of Canadian Heritage
Renderings: courtesy the Department of Canadian Heritage

A design team featuring Daniel Libeskind and Gail Dexter-Lord has won a competition with its design for the Canadian National Holocaust Monument in Toronto.

The winning design, called "Landscape of Loss, Memory and Survival," is based on the Star of David. It beat out five competing submissions from the likes of David Adjaye, Julian Bonder, and Gilles Saucier.

"We are deeply honoured to be entrusted with designing the monument to Holocaust victims and survivors, and we are committed to creating a place of meaning and value for all Canadians in our country's capital," said Gail Dexter-Lord, Dezeen reports.

The monument is set to open in the autumn of 2015. Check out the original entry below.

Team Lord


 
Team Members
Gail Lord (museum planner)
Daniel Libeskind (architect)
Edward Burtynsky (artist)
Claude Cormier (landscape architect)
Dr. Doris Berger (Holocaust scholar)
 
Essay
The star that the Nazis forced millions of Jews to wear throughout Europe, in ghettos and in camps, to exclude them from humanity and to mark them for extermination, remains the visual symbol of the Holocaust. The Nazis and their collaborators also?used the triangles that comprise the star to label homosexuals, Roma, Sinti, Jehovah’s Witnesses and political and religious prisoners for murder. People with disabilities were the first targets of mass killing. When the Monument is seen from the green roof of the War Museum, the symbol of the star becomes clear.
 
“The Journey Through the Star” as designed by architect Daniel Libeskind is organized with two physical ground planes: the ascending landscape that points to the future and the descending plane into the Memorial.
 
People enter the Monument from Booth Street and descend between two tilted geometric structures: one polished concrete; the other a mesh screen that references incarceration behind fences of often electrified barbed wire through which a landscape is still visible.
 
At the bottom of the descending landscape we arrive at the “Gathering Place” which can accommodate up to 1,000 people for events such as National Holocaust Remembrance Day (in April), International Holocaust Remembrance Day (in January) and Human Rights Day (in December).
 
The space is traversed by a railway track embedded in the ground reminding us of the trains that transported people to their death. Surrounding the Gathering Space are tilted geometric concrete and mesh structures that create six triangular thematic spaces for contemplation and reflection.
 
 

Related Stories

| Dec 12, 2011

AIA Chicago announces Skidmore, Owings & Merrill as 2011 Firm of the Year

SOM has been a leader in the research and development of specialized technologies, new processes and innovative ideas, many of which have had a palpable and lasting impact on the design profession and the physical environment. 

| Dec 12, 2011

Skanska to expand and renovate hospital in Georgia for $103 Million

The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.

| Dec 12, 2011

CRSI design awards deadline extended to December 31

The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 10, 2011

10 Great Solutions

The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.

| Dec 10, 2011

Energy performance starts at the building envelope

Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.

| Dec 10, 2011

Turning Balconies Outside In

Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures. 

| Dec 10, 2011

BIM tools to make your project easier to manage

Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.

| Dec 9, 2011

BEST AEC FIRM 2011: MHTN Architects

Serving Utah for nearly eight decades.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021