flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Libeskind wins competition to design Canadian National Holocaust Monument

Libeskind wins competition to design Canadian National Holocaust Monument

The plan came out ahead of David Adjaye and four others in the competition.


By BD+C Staff | May 13, 2014
Renderings: courtesy the Department of Canadian Heritage
Renderings: courtesy the Department of Canadian Heritage

A design team featuring Daniel Libeskind and Gail Dexter-Lord has won a competition with its design for the Canadian National Holocaust Monument in Toronto.

The winning design, called "Landscape of Loss, Memory and Survival," is based on the Star of David. It beat out five competing submissions from the likes of David Adjaye, Julian Bonder, and Gilles Saucier.

"We are deeply honoured to be entrusted with designing the monument to Holocaust victims and survivors, and we are committed to creating a place of meaning and value for all Canadians in our country's capital," said Gail Dexter-Lord, Dezeen reports.

The monument is set to open in the autumn of 2015. Check out the original entry below.

Team Lord


 
Team Members
Gail Lord (museum planner)
Daniel Libeskind (architect)
Edward Burtynsky (artist)
Claude Cormier (landscape architect)
Dr. Doris Berger (Holocaust scholar)
 
Essay
The star that the Nazis forced millions of Jews to wear throughout Europe, in ghettos and in camps, to exclude them from humanity and to mark them for extermination, remains the visual symbol of the Holocaust. The Nazis and their collaborators also?used the triangles that comprise the star to label homosexuals, Roma, Sinti, Jehovah’s Witnesses and political and religious prisoners for murder. People with disabilities were the first targets of mass killing. When the Monument is seen from the green roof of the War Museum, the symbol of the star becomes clear.
 
“The Journey Through the Star” as designed by architect Daniel Libeskind is organized with two physical ground planes: the ascending landscape that points to the future and the descending plane into the Memorial.
 
People enter the Monument from Booth Street and descend between two tilted geometric structures: one polished concrete; the other a mesh screen that references incarceration behind fences of often electrified barbed wire through which a landscape is still visible.
 
At the bottom of the descending landscape we arrive at the “Gathering Place” which can accommodate up to 1,000 people for events such as National Holocaust Remembrance Day (in April), International Holocaust Remembrance Day (in January) and Human Rights Day (in December).
 
The space is traversed by a railway track embedded in the ground reminding us of the trains that transported people to their death. Surrounding the Gathering Space are tilted geometric concrete and mesh structures that create six triangular thematic spaces for contemplation and reflection.
 
 

Related Stories

| Feb 16, 2012

Gain greater agility and profitability with ArchiCAD BIM software

White paper was written with the sole purpose of providing accurate, reliable information about critical issues related to BIM and what ArchiCAD with advanced technology such as the GRAPHISOFT BIM Server provide as an answer to address these issues.

| Feb 16, 2012

TLC Engineering for Architecture opens Chattanooga office

TLC Engineering for Architecture provides mechanical, electrical, structural, plumbing, fire protection, communication, technology, LEED, commissioning and energy auditing services.

| Feb 16, 2012

Summit Design + Build begins build-out for Emmi Solutions in Chicago

The new headquarters will total 20,455 sq. ft. and feature a loft-style space with exposed masonry and mechanical systems, 15 foot clear ceilings, two large rooftop skylights and private offices with full glass partition walls.

| Feb 16, 2012

Highland named president of McCarthy Building Companies’ California region

Highland moved into this new role in January 2012 following a six-month transition period with Carter Chappell, the company’s former president, California region.

| Feb 16, 2012

Big-box retailers not just for DIYers

Nearly half of all contractor purchases made from stores like Home Depot and Lowe's.

| Feb 16, 2012

4.8-megawatt solar power system completed at Jersey Gardens Mall

Solar array among the largest rooftop systems in North America.

| Feb 15, 2012

Fourth-generation Ryan to lead Ryan Companies AE team

Ryan leads a team of eight architects, four civil engineers, two landscape architects and two virtual building specialists in their efforts to realize their customer’s vision and needs through Ryan’s integrated project delivery system.

| Feb 15, 2012

NAHB sees gradual improvement in multifamily sales for boomers

However, since the conditions of the current overall housing market are limiting their ability to sell their existing homes, this market is not recovering as quickly as might have been expected.

| Feb 15, 2012

Skanska secures $87M contract for subway project

The construction value of the project is $261.9 M. Skanska will include its full share, $87 M, in the bookings for Skanska USA Civil for the first quarter 2012.

| Feb 15, 2012

Code allowance offers retailers and commercial building owners increased energy savings and reduced construction costs

Specifying air curtains as energy-saving, cost-cutting alternatives to vestibules in 3,000-square-foot buildings and larger has been a recent trend among consulting engineers and architects.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021