flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Libeskind wins competition to design Canadian National Holocaust Monument

Libeskind wins competition to design Canadian National Holocaust Monument

The plan came out ahead of David Adjaye and four others in the competition.


By BD+C Staff | May 13, 2014
Renderings: courtesy the Department of Canadian Heritage
Renderings: courtesy the Department of Canadian Heritage

A design team featuring Daniel Libeskind and Gail Dexter-Lord has won a competition with its design for the Canadian National Holocaust Monument in Toronto.

The winning design, called "Landscape of Loss, Memory and Survival," is based on the Star of David. It beat out five competing submissions from the likes of David Adjaye, Julian Bonder, and Gilles Saucier.

"We are deeply honoured to be entrusted with designing the monument to Holocaust victims and survivors, and we are committed to creating a place of meaning and value for all Canadians in our country's capital," said Gail Dexter-Lord, Dezeen reports.

The monument is set to open in the autumn of 2015. Check out the original entry below.

Team Lord


 
Team Members
Gail Lord (museum planner)
Daniel Libeskind (architect)
Edward Burtynsky (artist)
Claude Cormier (landscape architect)
Dr. Doris Berger (Holocaust scholar)
 
Essay
The star that the Nazis forced millions of Jews to wear throughout Europe, in ghettos and in camps, to exclude them from humanity and to mark them for extermination, remains the visual symbol of the Holocaust. The Nazis and their collaborators also?used the triangles that comprise the star to label homosexuals, Roma, Sinti, Jehovah’s Witnesses and political and religious prisoners for murder. People with disabilities were the first targets of mass killing. When the Monument is seen from the green roof of the War Museum, the symbol of the star becomes clear.
 
“The Journey Through the Star” as designed by architect Daniel Libeskind is organized with two physical ground planes: the ascending landscape that points to the future and the descending plane into the Memorial.
 
People enter the Monument from Booth Street and descend between two tilted geometric structures: one polished concrete; the other a mesh screen that references incarceration behind fences of often electrified barbed wire through which a landscape is still visible.
 
At the bottom of the descending landscape we arrive at the “Gathering Place” which can accommodate up to 1,000 people for events such as National Holocaust Remembrance Day (in April), International Holocaust Remembrance Day (in January) and Human Rights Day (in December).
 
The space is traversed by a railway track embedded in the ground reminding us of the trains that transported people to their death. Surrounding the Gathering Space are tilted geometric concrete and mesh structures that create six triangular thematic spaces for contemplation and reflection.
 
 

Related Stories

| Sep 13, 2012

Acentech adds audiovisual expertise to Trevose, Penn. office

Artese focuses on advising, overseeing, and maintaining the client’s vision for the project from the initial kick-off meeting to the final commissioning of the completed systems.

| Sep 13, 2012

Margulies Perruzzi Architects completes office design for Pioneer Investments

MPA updated the office design and additional support space consisting of five floors at Pioneer’s Boston office located at 60 State Street.

| Sep 12, 2012

Harvesting new ways to eliminate waste at the USDA

After installing 20 high-speed, energy-efficient hand dryers in restrooms throughout the USDA headquarters; the USDA reports seeing an immediate 50% reduction in the use of paper towels.

| Sep 11, 2012

RTKL appoints Lance Hosey as Chief Sustainability Officer and Senior Vice President

Author and authority on green design to spearhead RTKL Performance-driven DesignSM initiative.

| Sep 11, 2012

McQuade appointed CEO of Tishman Construction

McQuade will focus on driving the growth of the company into new markets and expanding market share in its current areas of operation.

| Sep 11, 2012

Ecosystem Management & Associates joins HDR

EM&A staff will do business as part of HDR Engineering and HDR Environmental, Operations and Construction.

| Sep 10, 2012

Specialty door types—plenty of functional variety

In the MasterFormat section 08 30 00, Specialty Doors and Frames, a number of door types are listed for special functions, access locations, sliding and folding hardware, and even pressure-resistant types.

| Sep 7, 2012

7 Do's and Don'ts for PV roof rack installation

As PVs grow in popularity, nearly half of all installations require roof rack systems. Our expert tells how to do the job right and protect your client’s roof.

| Sep 7, 2012

Net-zero energy pioneers on the el-hi frontier

Getting to net-zero is not easy, but the promise of eliminating energy bills and using state-of-the-art technology as a learning lab can make a compelling case to reach for net-zero.

| Sep 7, 2012

Healthcare architects get a preview of tomorrow’s medical landscape

The topic on everyone’s mind was how the Affordable Care Act would impact healthcare design and construction––and whether the law would even make it past the coming election cycle.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021