flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

LEO A DALY appoints a long-time associate to lead its engineering practice

Engineers

LEO A DALY appoints a long-time associate to lead its engineering practice

Kim Cowman, who has been with the firm 17 years, is a proponent of integrated project design and delivery.


By John Caulfield, Senior Editor | December 16, 2019

Kim Cowman, LEO A DALY's first National Director of Engineering, has extensive experience managing healthcare projects. Photo: Courtesy of LEO A DALY

LEO A DALY has tapped Kimberly Cowman, a 17-year company veteran, to be its first National Director of Engineering, which will become effective sometime after January 1, 2020.

The 38-year-old Cowman, PE, LEED AP, HFDP, and Senior Associate, will report to John Kraskiewicz, AIA, the firm’s Senior Vice President and COO. She is meeting this week with the company’s brand leadership to discuss her staffing needs, as well as plans for restructuring LEO A DALY’S engineering services with an eye toward growing that practice.

In an interview this morning with BD+C, Cowman said she was “excited and nervous” about embarking on this “new adventure” in a career that is distinguished by her management of myriad healthcare projects. These include, most recently, multiple pharmacy UPS compliance renovations for CHI Health in Nebraska and Iowa, and a $13 million 34,000-sf addition/renovation to Phelps Memorial Health Center in Holdrege, Neb.

Cowman sees her new job as more of a “brand position,” where she’ll be working closely with all of the firm’s design studios and their brand leaders on strategy. She sees herself as an “advocate for engineering” across geographies and market sectors, and for Integrated Project Delivery “which LEO A DALY does really well.”

“One of the primary reasons I enjoy working at LEO A DALY, and have remained here for 17 years, is my commitment to our full-service integrated design practice,” she says.

IPD is “key to creating sustainable, high-performance buildings that deliver the most value to our clients,” says Steve Lichtenberger, LEO A DALY’S President. “Kim’s strategic vision for growing our engineering practice, her deep understanding of our design culture, and her passion for innovation make her the perfect choice to lead engineering for the firm.”

At a time when AEC firms are trying to attract more women to their ranks and corporate suites, Cowman has actively participated in recruiting and hiring engineers for the firm’s Omaha office, and has worked to develop new engineering positions—such as High-Performance Building Engineer—that enhance the practice. Cowman has also demonstrated thought leadership through publishing and speaking engagements.

Cowman is a graduate of the University of Nebraska, from which she earned a Masters in Architectural Engineering. She’s a mother of two boys, six and two, and her husband is a cartographer for the U.S. Army Corps of Engineers.

 

Tags

Related Stories

Energy-Efficient Design | Apr 19, 2022

A prefab second skin can make old apartments net zero

A German startup is offering a new way for old buildings to potentially reach net-zero status: adding a prefabricated second skin.

Concrete Technology | Apr 19, 2022

SGH’s Applied Science & Research Center achieves ISO 17025 accreditation for concrete testing procedures

Simpson Gumpertz & Heger’s (SGH) Applied Science & Research Center recently received ISO/IEC17025 accreditation from the American Association for Laboratory Accreditation (A2LA) for several concrete testing methods.

Senior Living Design | Apr 19, 2022

Affordable housing for L.A. veterans and low-income seniors built on former parking lot site

The Howard and Irene Levine Senior Community, designed by KFA Architecture for Mercy Housing of California, provides badly needed housing for Los Angeles veterans and low-income seniors

Sponsored | BD+C University Course | Apr 19, 2022

Multi-story building systems and selection criteria

This course outlines the attributes, functions, benefits, limits, and acoustic qualities of composite deck slabs. It reviews the three primary types of composite systems that represent the full range of long-span composite floor systems and examines the criteria for their selection, design, and engineering.

Building Team | Apr 18, 2022

Shive-Hattery Acquires WSM Architects

Shive-Hattery announces that it has acquired WSM Architects, Inc., a 13-person architecture firm in Tucson, Arizona. 

University Buildings | Apr 18, 2022

SmithGroup to design new Univ. of Colorado Denver engineering, design, computing building

The University of Colorado Denver selected SmithGroup to design a new engineering, design, and computing building that will serve as anchor of new downtown innovation district.

Building Team | Apr 15, 2022

Frank Gehry to design his largest building yet for his hometown of Toronto

Famed architect Frank Gehry will design his largest building to date for his hometown of Toronto, Canada.

Healthcare Facilities | Apr 14, 2022

Healthcare construction veteran creates next-level IPD process for hospital projects

Can integrated project delivery work without incentives for building team members? Denton Wilson thinks so.

Industrial Facilities | Apr 14, 2022

JLL's take on the race for industrial space

In the previous decade, the inventory of industrial space couldn’t keep up with demand that was driven by the dual surges of the coronavirus and online shopping. Vacancies declined and rents rose. JLL has just published a research report on this sector called “The Race for Industrial Space.” Mehtab Randhawa, JLL’s Americas Head of Industrial Research, shares the highlights of a new report on the industrial sector's growth.

High-rise Construction | Apr 14, 2022

Seattle’s high-rise convention center nears completion

The new Washington State Convention Center Summit Building—billed as the first high-rise convention center in North America—is on track to complete most of its construction later this year.  

boombox1
boombox2
native1

More In Category


Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021