flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

LEO A DALY appoints a long-time associate to lead its engineering practice

Engineers

LEO A DALY appoints a long-time associate to lead its engineering practice

Kim Cowman, who has been with the firm 17 years, is a proponent of integrated project design and delivery.


By John Caulfield, Senior Editor | December 16, 2019

Kim Cowman, LEO A DALY's first National Director of Engineering, has extensive experience managing healthcare projects. Photo: Courtesy of LEO A DALY

LEO A DALY has tapped Kimberly Cowman, a 17-year company veteran, to be its first National Director of Engineering, which will become effective sometime after January 1, 2020.

The 38-year-old Cowman, PE, LEED AP, HFDP, and Senior Associate, will report to John Kraskiewicz, AIA, the firm’s Senior Vice President and COO. She is meeting this week with the company’s brand leadership to discuss her staffing needs, as well as plans for restructuring LEO A DALY’S engineering services with an eye toward growing that practice.

In an interview this morning with BD+C, Cowman said she was “excited and nervous” about embarking on this “new adventure” in a career that is distinguished by her management of myriad healthcare projects. These include, most recently, multiple pharmacy UPS compliance renovations for CHI Health in Nebraska and Iowa, and a $13 million 34,000-sf addition/renovation to Phelps Memorial Health Center in Holdrege, Neb.

Cowman sees her new job as more of a “brand position,” where she’ll be working closely with all of the firm’s design studios and their brand leaders on strategy. She sees herself as an “advocate for engineering” across geographies and market sectors, and for Integrated Project Delivery “which LEO A DALY does really well.”

“One of the primary reasons I enjoy working at LEO A DALY, and have remained here for 17 years, is my commitment to our full-service integrated design practice,” she says.

IPD is “key to creating sustainable, high-performance buildings that deliver the most value to our clients,” says Steve Lichtenberger, LEO A DALY’S President. “Kim’s strategic vision for growing our engineering practice, her deep understanding of our design culture, and her passion for innovation make her the perfect choice to lead engineering for the firm.”

At a time when AEC firms are trying to attract more women to their ranks and corporate suites, Cowman has actively participated in recruiting and hiring engineers for the firm’s Omaha office, and has worked to develop new engineering positions—such as High-Performance Building Engineer—that enhance the practice. Cowman has also demonstrated thought leadership through publishing and speaking engagements.

Cowman is a graduate of the University of Nebraska, from which she earned a Masters in Architectural Engineering. She’s a mother of two boys, six and two, and her husband is a cartographer for the U.S. Army Corps of Engineers.

 

Tags

Related Stories

| Feb 22, 2011

LEED Volume Program celebrates its 500th certified Pilot Project

More than 500 building projects have certified through the LEED Volume Program since the pilot launched in 2006, according to the U.S. Green Building Council. The LEED Volume Program streamlines the certification process for high-volume property owners and managers, from commercial real estate firms, national retailers and hospitality providers, to local, state and federal governments.

| Feb 14, 2011

Sustainable Roofing: A Whole-Building Approach

According to sustainability experts, the first step toward designing an energy-efficient roofing system is to see roof materials and systems as an integral component of the enclosure and the building as a whole. Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| Feb 11, 2011

Four Products That Stand Up to Hurricanes

What do a panelized wall system, a newly developed roof hatch, spray polyurethane foam, and a custom-made curtain wall have in common? They’ve been extensively researched and tested for their ability to take abuse from the likes of Hurricane Katrina.

| Feb 11, 2011

RS Means Cost Comparison Chart: Office Buildings

This month's RS Means Cost Comparison Chart focuses on office building construction.

| Feb 11, 2011

Sustainable features on the bill for dual-building performing arts center at Soka University of America

The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.

| Feb 11, 2011

BIM-enabled Texas church complex can broadcast services in high-def

After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.

| Feb 11, 2011

Kentucky’s first green adaptive reuse project earns Platinum

(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.

boombox1
boombox2
native1

More In Category


Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021