LEO A DALY has tapped Kimberly Cowman, a 17-year company veteran, to be its first National Director of Engineering, which will become effective sometime after January 1, 2020.
The 38-year-old Cowman, PE, LEED AP, HFDP, and Senior Associate, will report to John Kraskiewicz, AIA, the firm’s Senior Vice President and COO. She is meeting this week with the company’s brand leadership to discuss her staffing needs, as well as plans for restructuring LEO A DALY’S engineering services with an eye toward growing that practice.
In an interview this morning with BD+C, Cowman said she was “excited and nervous” about embarking on this “new adventure” in a career that is distinguished by her management of myriad healthcare projects. These include, most recently, multiple pharmacy UPS compliance renovations for CHI Health in Nebraska and Iowa, and a $13 million 34,000-sf addition/renovation to Phelps Memorial Health Center in Holdrege, Neb.
Cowman sees her new job as more of a “brand position,” where she’ll be working closely with all of the firm’s design studios and their brand leaders on strategy. She sees herself as an “advocate for engineering” across geographies and market sectors, and for Integrated Project Delivery “which LEO A DALY does really well.”
“One of the primary reasons I enjoy working at LEO A DALY, and have remained here for 17 years, is my commitment to our full-service integrated design practice,” she says.
IPD is “key to creating sustainable, high-performance buildings that deliver the most value to our clients,” says Steve Lichtenberger, LEO A DALY’S President. “Kim’s strategic vision for growing our engineering practice, her deep understanding of our design culture, and her passion for innovation make her the perfect choice to lead engineering for the firm.”
At a time when AEC firms are trying to attract more women to their ranks and corporate suites, Cowman has actively participated in recruiting and hiring engineers for the firm’s Omaha office, and has worked to develop new engineering positions—such as High-Performance Building Engineer—that enhance the practice. Cowman has also demonstrated thought leadership through publishing and speaking engagements.
Cowman is a graduate of the University of Nebraska, from which she earned a Masters in Architectural Engineering. She’s a mother of two boys, six and two, and her husband is a cartographer for the U.S. Army Corps of Engineers.
Related Stories
| Mar 7, 2012
Firestone iPad app offers touch technology
Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.
| Mar 7, 2012
LEO A DALY opens new office in Riyadh, Saudi Arabia
Jay N. Kline, Regional Manager – Saudi Arabia, to lead new office.
| Mar 7, 2012
Turner appointed Batson-Cook CFO and treasurer
Cecil G. Hood to continue in advisory role.
| Mar 7, 2012
Thornton Tomasetti names Dowdall VP of Kansas City office
Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.
| Mar 7, 2012
LEO A DALY selected to design Minnesota Fallen Firefighters Memorial
The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.
| Mar 7, 2012
Houlihan Lokey adds Steffen to Industrials Group
Steffen bolsters group with experience in the building materials and rorest product sectors.
| Mar 6, 2012
Country’s first Green House home for veterans completed
Residences at VA Danville to provide community-centered housing for military veterans.
| Mar 6, 2012
EwingCole completes first design-build project for the USMA
The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.
| Mar 6, 2012
Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago
Construction was completed by Skender in just 12 weeks.