flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

LEO A DALY appoints a long-time associate to lead its engineering practice

Engineers

LEO A DALY appoints a long-time associate to lead its engineering practice

Kim Cowman, who has been with the firm 17 years, is a proponent of integrated project design and delivery.


By John Caulfield, Senior Editor | December 16, 2019

Kim Cowman, LEO A DALY's first National Director of Engineering, has extensive experience managing healthcare projects. Photo: Courtesy of LEO A DALY

LEO A DALY has tapped Kimberly Cowman, a 17-year company veteran, to be its first National Director of Engineering, which will become effective sometime after January 1, 2020.

The 38-year-old Cowman, PE, LEED AP, HFDP, and Senior Associate, will report to John Kraskiewicz, AIA, the firm’s Senior Vice President and COO. She is meeting this week with the company’s brand leadership to discuss her staffing needs, as well as plans for restructuring LEO A DALY’S engineering services with an eye toward growing that practice.

In an interview this morning with BD+C, Cowman said she was “excited and nervous” about embarking on this “new adventure” in a career that is distinguished by her management of myriad healthcare projects. These include, most recently, multiple pharmacy UPS compliance renovations for CHI Health in Nebraska and Iowa, and a $13 million 34,000-sf addition/renovation to Phelps Memorial Health Center in Holdrege, Neb.

Cowman sees her new job as more of a “brand position,” where she’ll be working closely with all of the firm’s design studios and their brand leaders on strategy. She sees herself as an “advocate for engineering” across geographies and market sectors, and for Integrated Project Delivery “which LEO A DALY does really well.”

“One of the primary reasons I enjoy working at LEO A DALY, and have remained here for 17 years, is my commitment to our full-service integrated design practice,” she says.

IPD is “key to creating sustainable, high-performance buildings that deliver the most value to our clients,” says Steve Lichtenberger, LEO A DALY’S President. “Kim’s strategic vision for growing our engineering practice, her deep understanding of our design culture, and her passion for innovation make her the perfect choice to lead engineering for the firm.”

At a time when AEC firms are trying to attract more women to their ranks and corporate suites, Cowman has actively participated in recruiting and hiring engineers for the firm’s Omaha office, and has worked to develop new engineering positions—such as High-Performance Building Engineer—that enhance the practice. Cowman has also demonstrated thought leadership through publishing and speaking engagements.

Cowman is a graduate of the University of Nebraska, from which she earned a Masters in Architectural Engineering. She’s a mother of two boys, six and two, and her husband is a cartographer for the U.S. Army Corps of Engineers.

 

Tags

Related Stories

| Sep 24, 2012

Chicago Lakeside shortlisted for the Sustainia Award

The “Lakeside Idea” is about bridging a brownfield industrial past to a green lifestyle future, from steel mill to innovation mill.

| Sep 24, 2012

$3.8-million athletic field and track opens in Glen Head, N.Y.

The complex also includes a new, one-story, multi-purpose building that serves as the main entry port to the athletic facilities.

| Sep 21, 2012

AAMA and WDMA release updated review and forecast that predicts industry trends

Significant volume is expected to return to the entry and interior door market as new construction demand is expected to grow at double-digit rates, outpacing remodeling and replacement activity as the housing market recovers.

| Sep 20, 2012

Mid-box retail study shows lack of available sites in Chicago

Existing supply is tight everywhere and almost non-existent in the most attractive zones.

| Sep 20, 2012

Forrester begins construction of freestanding cancer center in Montgomery County, Md.

The new 51,000-square-foot building will include two linear accelerator vaults for radiation equipment.

| Sep 19, 2012

Modular, LEED-Gold Certified Dormitory Accommodates Appalachian State University Growth

By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with traditional construction.

| Sep 19, 2012

ABI back into positive territory

South continues to lead regions in demand for design services.

| Sep 19, 2012

HGA Architects & Engineers moves offices in San Francisco

HGA’s San Francisco office has grown by nearly 25% in the past two years, adding shared expertise to the 120-person California practice, which includes the Sacramento and Los Angeles offices.

| Sep 19, 2012

Sasaki opens office in Shanghai

Office supports firm’s present and future work in China, throughout Asia.

| Sep 18, 2012

MBMA partners with ORNL for whole building energy efficiency study

The results are intended to advance energy efficiency solutions for new and retrofit applications.

boombox1
boombox2
native1

More In Category


Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021