flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Length of North American construction disputes continues to increase

Codes and Standards

Length of North American construction disputes continues to increase

They already far exceed global average.


By Peter fabris, Contributing Editor | July 16, 2018

The average time taken to resolve construction disputes in North America increased to an average of 17.7 months in 2017, an increase of two months from 2016, according to a report released by Arcadis.

Length of disputes in the region far exceeded the global average, the report says. Globally, the length of time to resolve disputes stood at 14.8 months, a one month increase over 2016.

The average value of North American disputes decreased to US $19M in 2017 from $21M in 2016. Globally, the figure stood at US $43.4M, up from $32.5M in 2016.

“Failure to properly administer the contract” remained the most common cause of construction disputes globally, and “errors and/or omissions in the contract documentation” remained the most common cause in North America. With positive economic drivers and larger and more complex projects anticipated this year, there is a critical need to embrace more sophisticated risk management and claims avoidance techniques, including leveraging digitalization, Arcadis says.

Related Stories

Codes and Standards | Mar 19, 2020

CaGBC launches new version of its Zero Carbon Building Standard

Version 2 draws on lessons from more than 20 zero carbon projects.

Codes and Standards | Mar 16, 2020

Concrete industry reduces carbon footprint by 13% over five years

Result mostly due to more efficient use of Portland cement.

Resiliency | Mar 13, 2020

Feds push use of eminent domain to force people out of flood-prone homes

Local officials that don’t comply could lose federal money to combat climate change.

Codes and Standards | Mar 12, 2020

Design guide for sloped glazing and skylights updated for first time in 30 years

Helps with choosing proper glass for non-residential applications.

Codes and Standards | Mar 11, 2020

Two tree species native to the Northeast found suitable for CLT

Eastern white pine and eastern hemlock pass strength testing.

Codes and Standards | Mar 10, 2020

Prescient receives ICC certification for seismic resilience system

Technology suitable for buildings up to 12 stories in earthquake-prone areas.

Codes and Standards | Mar 6, 2020

Design firms creating plans to re-imagine D.C.’s tidal basin

Area including National Mall is facing increased flood risk.

boombox1
boombox2
native1

More In Category

Reconstruction & Renovation

Movement to protect historic buildings raises sharp criticism

While the movement to preserve historic buildings has widespread support, it also has some sharp critics with well-funded opposition groups springing up in recent years. Some opponents are linked to the Stand Together Foundation, founded and bankrolled by the Koch family’s conservative philanthropic organization, according to a column in Governing magazine.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021