flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Length of North American construction disputes continues to increase

Codes and Standards

Length of North American construction disputes continues to increase

They already far exceed global average.


By Peter fabris, Contributing Editor | July 16, 2018

The average time taken to resolve construction disputes in North America increased to an average of 17.7 months in 2017, an increase of two months from 2016, according to a report released by Arcadis.

Length of disputes in the region far exceeded the global average, the report says. Globally, the length of time to resolve disputes stood at 14.8 months, a one month increase over 2016.

The average value of North American disputes decreased to US $19M in 2017 from $21M in 2016. Globally, the figure stood at US $43.4M, up from $32.5M in 2016.

“Failure to properly administer the contract” remained the most common cause of construction disputes globally, and “errors and/or omissions in the contract documentation” remained the most common cause in North America. With positive economic drivers and larger and more complex projects anticipated this year, there is a critical need to embrace more sophisticated risk management and claims avoidance techniques, including leveraging digitalization, Arcadis says.

Related Stories

| Feb 22, 2012

ACI BIM manual for cast-in-place concrete in development

The improved communication, coordination, and collaboration afforded by BIM implementation have already been shown to save time and money in projects.

| Feb 20, 2012

Comment period for update to USGBC's LEED Green Building Program now open

This third draft of LEED has been refined to address technical stringency and rigor, measurement and performance tools, and an enhanced user experience.

| Feb 20, 2012

GAF introduces web portal for architects and specifiers

The new portal offers a clean look with minimal clutter to make it easier to find the technical information and product data that architects need.

| Feb 17, 2012

AGC advocates for federal procurement reform

Ensure that small business goals take into consideration actual small business capacity in relevant specialty markets.

| Feb 17, 2012

Codes not to blame for Anchorage roof collapses following heavy snows

Design or construction problems likely contributed to the collapses, according to city officials.

| Feb 17, 2012

Comment period opens March 1 for LEED 2012 update

USGBC says that LEED's strength comes from its continuous evolution.

| Feb 17, 2012

OSHA training videos on proper respirator use available online

17 short videos to help workers learn about the proper use of respirators on the job.

| Feb 17, 2012

Union/employer collaboration on the rise aimed at exceeding OSHA safety standards

Unions have learned to help employers win contracts with bids made competitive through good safety practices.

| Feb 16, 2012

Gain greater agility and profitability with ArchiCAD BIM software

White paper was written with the sole purpose of providing accurate, reliable information about critical issues related to BIM and what ArchiCAD with advanced technology such as the GRAPHISOFT BIM Server provide as an answer to address these issues.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021