flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Length of North American construction disputes continues to increase

Codes and Standards

Length of North American construction disputes continues to increase

They already far exceed global average.


By Peter fabris, Contributing Editor | July 16, 2018

The average time taken to resolve construction disputes in North America increased to an average of 17.7 months in 2017, an increase of two months from 2016, according to a report released by Arcadis.

Length of disputes in the region far exceeded the global average, the report says. Globally, the length of time to resolve disputes stood at 14.8 months, a one month increase over 2016.

The average value of North American disputes decreased to US $19M in 2017 from $21M in 2016. Globally, the figure stood at US $43.4M, up from $32.5M in 2016.

“Failure to properly administer the contract” remained the most common cause of construction disputes globally, and “errors and/or omissions in the contract documentation” remained the most common cause in North America. With positive economic drivers and larger and more complex projects anticipated this year, there is a critical need to embrace more sophisticated risk management and claims avoidance techniques, including leveraging digitalization, Arcadis says.

Related Stories

Codes and Standards | Aug 3, 2017

ASID headquarters is first space in the world to earn both LEED and WELL Platinum Certification

Washington, D.C. office is showcase for top levels of the two standards.

Codes and Standards | Aug 2, 2017

OSHA to release web-based injury and illness reporting form on August 1st

Employers can use the application to submit forms electronically.

Codes and Standards | Aug 1, 2017

Zoning that restricts housing construction also dampens other economic development

Land use restrictions reduce U.S. GDP by 9% annually.

Codes and Standards | Jul 27, 2017

Five fire scenarios tested on full-scale mass timber building

Results will help inform code changes.

Codes and Standards | Jul 26, 2017

New ISO standard on video fire detectors will help identify fires more quickly

The standard marks the first comprehensive international specification for this equipment.

Codes and Standards | Jul 25, 2017

Geotechnical solutions prevent building distress due to expansive clay soils

The condition is the most common geologic hazard in the U.S.

Codes and Standards | Jul 24, 2017

Non-union labor gaining ground in New York City

President of contractors’ group says competitive pricing is spurring more open shops.

Codes and Standards | Jul 20, 2017

New tallest tower west of the Mississippi built to stringent seismic standards

L.A.’s new 1,100-foot skyscraper dominates city’s skyline.

Codes and Standards | Jul 19, 2017

Economic impacts of climate change will jump over next two decades

Average annual cost to buildings and infrastructure from eastern storms to rise by $7.3 billion.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021