flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lendlease launches new protocol for Scope 3 carbon reduction

Codes and Standards

Lendlease launches new protocol for Scope 3 carbon reduction

The protocol includes a call for better measurement and reporting industrywide


By Peter Fabris, Contributing Editor | September 25, 2023
Lendlease launches new protocol for Scope 3 carbon reduction
Scope 3 emissions are indirect emissions that occur in an organization’s value chain and often make up the majority of an organization’s carbon footprint. Lendlease says Scope 3 emissions comprise about 90% of its global carbon footprint.

Lendlease unveiled a new protocol to monitor, measure, and disclose Scope 3 carbon emissions and called on built environment industry leaders to tackle this challenge.

Scope 3 emissions are indirect emissions that occur in an organization’s value chain and often make up the majority of an organization’s carbon footprint. Lendlease says Scope 3 emissions comprise about 90% of its global carbon footprint.

Scope 3 emissions data, embedded in carbon-intensive materials such as steel, cement, aluminum, and glass, are especially challenging to track and measure. They have multiple source points and different levels of transparency, completeness, and assurance. Methods and standards for their calculation are inconsistent, and there is no standardized data exchange for them.

Lendlease is driving to change that with its new protocol that includes a Scope 3 Reporting Assessment Tool with more than 50 possible subcategories.

“We want the protocol to spark conversation and engagement across our sector, to help drive to a consensus on how to account for and report on Scope 3 emissions,” said Cate Harris, group head of sustainability. “If we can achieve this, then we can collaborate as an industry to solve the two big systemic challenges: the decarbonization of harder to abate materials, and the digitization and sharing of Scope 3 emissions data.”

Related Stories

Codes and Standards | Nov 14, 2019

Resistance to Toronto’s ‘smart city’ reveals pitfalls of such ambitious projects

Concerns over data privacy, governance, feasibility prompt criticism.

Codes and Standards | Nov 13, 2019

Heat pumps, strategic energy management could be next major focuses for efficiency

After lighting, efficiency experts look to new opportunities to boost energy efficiency.

Codes and Standards | Nov 12, 2019

National Infrastructure Performance Council to address ‘national security crisis’

Coalition wants to double annual level of infrastructure investment.

Codes and Standards | Nov 11, 2019

Major cities are adopting new building performance standards

Initiatives can include multiple standards.

Codes and Standards | Nov 11, 2019

U.S. hotel construction pipeline continues its year-over-year growth

In its eighth consecutive quarter of growth, projects currently under construction stand at 1,729 projects/235,278 rooms.

Codes and Standards | Nov 11, 2019

New retrofit design guide for metal roofing published

Metal Construction Association document provides best practices for re-roofing with metal.

Codes and Standards | Nov 8, 2019

New York City among the top hotel construction pipelines in the United States

Hotels presently under construction are at 102 projects/17,504 rooms.

Codes and Standards | Nov 7, 2019

Group focused on using AI for construction safety gains key members

Major contractors join partnership to share data to predict hazards, incidents.

Codes and Standards | Nov 6, 2019

Undisclosed ICC agreement with NAHB alleged to thwart more stringent efficiency codes

Homebuilders’ seats on ICC made it easier to block new provisions, report alleges.

Codes and Standards | Nov 4, 2019

ASHRAE releases new version of energy efficiency standard for buildings

Standard 90.1 includes revisions of envelope, lighting, HVAC provisions.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021