flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lendlease launches new protocol for Scope 3 carbon reduction

Codes and Standards

Lendlease launches new protocol for Scope 3 carbon reduction

The protocol includes a call for better measurement and reporting industrywide


By Peter Fabris, Contributing Editor | September 25, 2023
Lendlease launches new protocol for Scope 3 carbon reduction
Scope 3 emissions are indirect emissions that occur in an organization’s value chain and often make up the majority of an organization’s carbon footprint. Lendlease says Scope 3 emissions comprise about 90% of its global carbon footprint.

Lendlease unveiled a new protocol to monitor, measure, and disclose Scope 3 carbon emissions and called on built environment industry leaders to tackle this challenge.

Scope 3 emissions are indirect emissions that occur in an organization’s value chain and often make up the majority of an organization’s carbon footprint. Lendlease says Scope 3 emissions comprise about 90% of its global carbon footprint.

Scope 3 emissions data, embedded in carbon-intensive materials such as steel, cement, aluminum, and glass, are especially challenging to track and measure. They have multiple source points and different levels of transparency, completeness, and assurance. Methods and standards for their calculation are inconsistent, and there is no standardized data exchange for them.

Lendlease is driving to change that with its new protocol that includes a Scope 3 Reporting Assessment Tool with more than 50 possible subcategories.

“We want the protocol to spark conversation and engagement across our sector, to help drive to a consensus on how to account for and report on Scope 3 emissions,” said Cate Harris, group head of sustainability. “If we can achieve this, then we can collaborate as an industry to solve the two big systemic challenges: the decarbonization of harder to abate materials, and the digitization and sharing of Scope 3 emissions data.”

Related Stories

Codes and Standards | Apr 26, 2021

Dozens of companies, organizations call for Congress to double Energy Star funding

Despite broad support, program’s budget has steadily declined in recent years.

Codes and Standards | Apr 22, 2021

Alabama fire chiefs oppose proposal to change school building code oversight

Bill would move code compliance control from state to local boards.

Codes and Standards | Apr 21, 2021

After dry winter, California ramps up wildfire prevention efforts

State to spend half a billion dollars on projects including making buildings more fire resistant.

Codes and Standards | Apr 20, 2021

U.S. electric grid is halfway to zero carbon

Other sectors including buildings lag power industry.

Codes and Standards | Apr 19, 2021

Failed landmark preservation effort in Chicago provides lessons for planners

Gentrification fears heightened among Pilsen neighborhood residents doomed ambitious preservation plan.

Codes and Standards | Apr 14, 2021

New Phase 1 Environmental Site Assessment standard debuts in 2021

Will affect 250,000 commercial real estate deals a year.

Codes and Standards | Apr 13, 2021

British Columbia moves to accelerate mass timber construction

Province funds demonstration projects as part of economic recovery.

Codes and Standards | Apr 12, 2021

WoodWorks and Think Wood release first Mass Timber Design Manual

Interactive collection of information on mass timber products, design best practices, taller wood construction and sustainability.

Codes and Standards | Apr 8, 2021

Sensors used in tunable lighting systems found to have high reliability

DOE study investigated items used to control lumen depreciation, chromaticity shifts, and changes in drivers.

Codes and Standards | Apr 7, 2021

Red tape ruined the U.K.’s home retrofit program

Lessons learned could help US avoid that fate.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021