flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lend Lease’s role in 9/11 Memorial & Museum

Lend Lease’s role in 9/11 Memorial & Museum


By By BD+C Staff | September 14, 2011
Lend Lease is honored to be the general contractor for the National September 11 Memorial & Museum project at the World Trade Ce

According to a press release issued by the company, Lend Lease is honored to be the general contractor for the National September 11 Memorial & Museum project at the World Trade Center site in New York City. The Memorial part of the structure was opened September 11th in commemoration of the 10th anniversary of 9/11. The Museum will open, as scheduled, in 2012.

The Memorial features two reflecting pools, each nearly an acre in size that sit in the footprints of the former Twin Towers. It also includes the largest manmade waterfall in North America and more than 400 swamp white oak trees that envelop the pools. The names of the nearly 3,000 people who lost their lives on 9/11 and those who perished in the World Trade Center bombing in 1993 are engraved on bronze panels surrounding the pools. BD+C

Related Stories

Architects | Sep 22, 2017

Design giants merge: FKP joins CannonDesign

The deal strengthens CannonDesign’s pediatric healthcare expertise, establishes presence in Texas and Ohio.

40 Under 40 | Sep 22, 2017

Meet the 40 Under 40 Class of 2017

These AEC stars are making their mark in business, philanthropy, and in their communities.

40 Under 40 | Sep 21, 2017

Meet the 40 Under 40 Class of 2017

These AEC stars are making their mark in business, philanthropy, and in their communities.

Office Buildings | Sep 20, 2017

Five Stantec offices move into one Fifth Avenue location

The new location provides the firm with 40,000 sf of space.

Architects | Sep 19, 2017

What we talk about when we talk about placemaking

What does Good Growth mean and how do we set about achieving it?

Architects | Sep 13, 2017

Leo A Daly hires hospitality-design veteran to lead its Dallas office

Ken Martin views this sector as an incubator of innovation.

Museums | Sep 8, 2017

CAF announces plans for 20,000-sf Chicago Architecture Center to be built on East Wacker Drive

The Adrian Smith + Gordon Gill-designed space will open in summer 2018.

Architects | Sep 6, 2017

Top 110 university architecture firms

Perkins+Will, Gensler, and CannonDesign top BD+C’s ranking of the nation’s largest university sector architecture and AE firms, as reported in the 2017 Giants 300 Report.

Contractors | Sep 6, 2017

Following the money: G702 progress payment certifications

There is no single method of calculating progress payments, but the most common formula is the percentage of completion applied to the total contract price, less a retainage which is held by the owner until final acceptance of the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021