flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lego X by Gravity elevates the toy to a digital modeling kit

BIM and Information Technology

Lego X by Gravity elevates the toy to a digital modeling kit

With the Lego X system, users can transfer the forms they’ve created with legos into real-time digital files.


By BD+C Staff | January 29, 2015
With the Lego X system, users can transfer the forms they’ve created with legos into real-time digital files.

When a physical block is moved, its interface "twin" does the exact same thing. Screenshot from Lego X.

The people at London-based sketch and modeling studio Gravity have found a way to turn Lego blocks into a digital modeling kit.

With the Lego X system, users can transfer the forms they’ve created with Lego into real-time digital files, Dezeen reports. The system recognizes forms built with Lego building blocks, and using location-mapping and gyroscopic sensors, it plots the position and orientation of each block to create a digital 3D model.

The tool models each block individually. If a physical block is moved, turned, lifted, or put down in real life, its digital “twin” in the monitor (a tablet or laptop) will behave exactly the same.

When multiple blocks form a larger cluster, they act as a single entity within the program. The saved files can be built upon more with image processing software, or sent to a 3D printer.

Dezeen believes that when the software is paired with the Lego Architecture Studio Kit, the technology “could provide a new tool for designing buildings” and prototyping.

Read more at Dezeen.

 

 

Related Stories

BIM and Information Technology | Apr 9, 2015

A carboard box by Google can bring virtual reality to architecture

The global search engine giant has launched a new product, Google Cardboard, that easily allows users to experience virtual reality.

BIM and Information Technology | Apr 9, 2015

How one team solved a tricky daylighting problem with BIM/VDC tools, iterative design

SRG Partnership's Scott Mooney describes how Grasshopper, Diva, Rhino, and 3D printing were utilized to optimize a daylighting scheme at Oregon State University's new academic building.

BIM and Information Technology | Apr 3, 2015

French startup develops drone camera that overlays video with 3D images

The new drones can capture video and overlay the shot results with 3D images and augmented reality remotely.

BIM and Information Technology | Mar 23, 2015

Drones for AEC: How every stage of a building project can benefit from drone technology

From photo-mapping to aerial progress videos, SRG Partnership's Dmitriy Molla studies real-world applications for unmanned aerial vehicles.

BIM and Information Technology | Mar 23, 2015

Skanska hosts three-week 'hackathon' to find architect for Seattle tower development

Searching for a nimble, collaborative design firm for its 2&U tower project in Seattle, the construction giant ditches the traditional RFQ/RFP process for a hackathon-inspired competition.

BIM and Information Technology | Mar 16, 2015

Berkeley researchers develop 3D-printable concrete powder

The technique allows teams to create more complex and precisely finished structures, with reduced weight and waste.

High-rise Construction | Mar 16, 2015

NBBJ creates 'shadowless' skyscraper concept for proposed UK development

A team of architects from the London branch of NBBJ used computer algorithms to generate a dual-tower design that maximizes sunlight reflections to eliminate the buildings' shadows. 

BIM and Information Technology | Mar 11, 2015

Google plans to use robots, cranes to manipulate modular offices at its new HQ

Its visions of “crabots” accentuate the search-engine giant’s recent fascination with robotics and automation.

Museums | Mar 5, 2015

A giant, silver loop in Dubai will house the Museum of the Future

The Sheikh of Dubai hopes the $136 million museum will serve as an incubator for ideas and real designs—a global destination for inventors and entrepreneurs.

BIM and Information Technology | Mar 4, 2015

Why China's CCTV building needed a WiFi retrofit

It took a year-long retrofit to get WiFi transmission issues solved at China's iconic skyscraper.

boombox1
boombox2
native1

More In Category



AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021