flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

LEGO, Google partner to develop 3D modeling tool for LEGO structures

LEGO, Google partner to develop 3D modeling tool for LEGO structures

The free tool allows Chrome users to create virtual 3D structures using any shape and color in the LEGO catalog. 


By BD+C Staff | January 31, 2014

If you're a LEGO fanatic like we are, you're going to love what the software engineers at Google and LEGO have developed: a 3D modeling tool that uses LEGO's iconic pieces as the building blocks.

The developers call it "the largest LEGO set the world has ever seen." 

The free application, called Build, allows Chrome browser users to create virtual 3D structures using any shape and color in the LEGO catalog. Users can build LEGO structures on any plot in the world, using a PC or mobile device. 

LEGO models can be saved and shared with other users. They can also view creations dreamt up by other builders. 

The site includes the Build Academy, which puts users through a series of building challenges in different locations, with the goal of attaining LEGO Master Builder status. Along the way, players can unlock new LEGO bricks and colors. 

OK, enough talk. Give it a try! http://www.buildwithchrome.com

 

 

Related Stories

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021