flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

LEED v4 has provision to reduce water use in cooling towers

LEED v4 has provision to reduce water use in cooling towers


By BD+C Staff | May 17, 2013

The next version of the U.S. Green Building Council's LEED rating system, LEED v4, will expand water-savings targets to appliances, cooling towers, commercial kitchen equipment, and other areas that consume a huge proportion of water in many buildings.

Reducing water lost through blowdown, when water is drained from cooling towers to reduce mineral and sediment accumulation, is the focus of LEED v4’s cooling tower credit. Projects pursuing the credit increase the number of cycles through which water can be re-circulated before it is removed by blowdown.

(http://www.usgbc.org/articles/new-ways-save-water-leed-v4?utm_source=USGBC.org+Subscriptions&utm_campaign=16ce2bca73-RSS_EMAIL_CAMPAIGN&utm_medium=email&utm_term=0_20404b2ecb-16ce2bca73-57008873)

Related Stories

| May 25, 2011

Low Impact Development: Managing Stormwater Runoff

Earn 1.0 AIA/CES HSW/SD learning units by studying this article and successfully passing the online exam.

| May 25, 2011

Register today for BD+C’s June 8th webinar on restoration and reconstruction projects

Based on new and award-winning building projects, this webinar presents our “expert faculty” to examine the key issues affecting project owners, designers and contractors in case studies ranging from gut renovations and adaptive reuses to restorations and retrofits.

boombox1
boombox2
native1

More In Category


Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021