flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

LEED puts the 'Gold' in Riverside golden arches

LEED puts the 'Gold' in Riverside golden arches

McDonald's restaurant recognized for significant energy savings.


By By BD+C Staff | January 19, 2012
Two hundred-ninety four solar panels help power the McDonalds restaurant at 2242 University Avenue in Riverside, Calif. On Jan
This article first appeared in the March 2012 issue of BD+C.

A McDonald's restaurant in Riverside, Calif., was recently awarded LEED Gold certification, the first McDonald's west of the Mississippi, and only the fourth in the U.S., to receive the designation. 

"This gold certification from LEED underscores our rigorous sustainability initiatives," said Candace Spiel, McDonald's owner/operator. "

This restaurant is owned and operated by Tom and Candace Spiel and stood as a McDonald's for 44 years. In 2010, the restaurant was completely rebuilt and reopened on October 14, 2010 containing a host of green features such as low-flow plumbing fixtures, recycled denim insulation inside the building, native drought-tolerant plants to reduce water consumption by landscape and solar panels.

The restaurant also includes an interactive touch-screen display for visitors to learn about the building's features, environmental sustainability, and how individuals can reduce their carbon footprint.

The University Avenue McDonald's has achieved the following water and energy-savings.

  • The restaurant's solar array has generated electrical energy which saves approximately 8,950 kWH per month of utility usage, which is equal to the power usage of 13 average Riverside homes for one month. Increased efficiencies such as low-E glass windows and LED lighting helped realize an additional energy savings of 2,870 kWH per month, which is equal to an additional four Riverside homes.
  • Saved approximately 250,000 gallons of water, which is equal to the water of eight 20 ft x 40 ft swimming pools. 
  • Due to permeable pavers, about 283,000 gallons of rainfall water is diverted from storm water system per year, which is equal to the water of nine 20 ft x 40 ft swimming pools. 

"We are delighted that this local McDonald's has taken such significant measures to conserve our natural resources while educating residents about the importance of energy conservation," said Ron Loveridge, mayor of Riverside.

Beginning as manager trainee and crewperson, respectively, over the last 40 years Tom and Candace have risen within the ranks of the McDonald's system to own and operate nine McDonald's restaurants in the Inland Empire located in Chino, Ontario, Montclair, Pomona, Riverside and Rubidoux. Both Tom and Candace are members of the McDonald's Operators' Association of Southern California, which is comprised of more than 120 small business owners who operate more than 600 McDonald's restaurants in the counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura. BD+C 

Related Stories

| Jan 6, 2012

Summit Design+Build completes Park Place in Illinois

Summit was responsible for the complete gut and renovation of the former auto repair shop which required the partial demolition of the existing building, while maintaining the integrity of the original 100 year-old structure, and significant re-grading and landscaping of the site.

| Jan 4, 2012

Siemens acquires Pace Global Energy Services

Acquisition will enhance portfolio with new energy consulting and management services.

| Jan 4, 2012

Shawmut Design & Construction awarded dorm renovations at Brown University

Construction is scheduled to begin in June 2012, and will be completed by December 2012.

| Jan 4, 2012

Skanska acquires Industrial Contractors

Industrial Contractors Inc. is a contractor in the commercial, industrial and power markets of the Midwest. The company employs 2,400 people and in 2011 the revenues are estimated to be approximately $500 million.

| Jan 4, 2012

HDR to design North America’s first fully digital hospital

Humber River  is the first hospital in North America to fully integrate and automate all of its processes; everything is done digitally.

| Jan 4, 2012

New LEED Silver complex provides space for education and research

The academic-style facility supports education/training and research functions, and contains classrooms, auditoriums, laboratories, administrative offices and library facilities, as well as spaces for operating highly sophisticated training equipment.

| Jan 3, 2012

Gilbane awarded $88M Contract for Ohio elementary school construction

The new award, which comprises the construction of five new elementary schools and demolition of 11 older facilities, is the latest K-12 building program managed by Gilbane for the Ohio School Facilities Commission since 1998.

| Jan 3, 2012

AIA's ABI November Index reaches 52.0

The Architecture Billings Index (ABI) reached its first positive mark since August. 

| Jan 3, 2012

Callison acquires Barteluce Architects & Associates

This acquisition will grow Callison’s New York team to over 75 architects.

| Jan 3, 2012

VDK Architects merges with Harley Ellis Devereaux

Harley Ellis Devereaux will relocate the employees in its current Berkeley, Calif., office to the new Oakland office location effective January 3, 2012.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021