flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

LEED puts the 'Gold' in Riverside golden arches

LEED puts the 'Gold' in Riverside golden arches

McDonald's restaurant recognized for significant energy savings.


By By BD+C Staff | January 19, 2012
Two hundred-ninety four solar panels help power the McDonalds restaurant at 2242 University Avenue in Riverside, Calif. On Jan
This article first appeared in the March 2012 issue of BD+C.

A McDonald's restaurant in Riverside, Calif., was recently awarded LEED Gold certification, the first McDonald's west of the Mississippi, and only the fourth in the U.S., to receive the designation. 

"This gold certification from LEED underscores our rigorous sustainability initiatives," said Candace Spiel, McDonald's owner/operator. "

This restaurant is owned and operated by Tom and Candace Spiel and stood as a McDonald's for 44 years. In 2010, the restaurant was completely rebuilt and reopened on October 14, 2010 containing a host of green features such as low-flow plumbing fixtures, recycled denim insulation inside the building, native drought-tolerant plants to reduce water consumption by landscape and solar panels.

The restaurant also includes an interactive touch-screen display for visitors to learn about the building's features, environmental sustainability, and how individuals can reduce their carbon footprint.

The University Avenue McDonald's has achieved the following water and energy-savings.

  • The restaurant's solar array has generated electrical energy which saves approximately 8,950 kWH per month of utility usage, which is equal to the power usage of 13 average Riverside homes for one month. Increased efficiencies such as low-E glass windows and LED lighting helped realize an additional energy savings of 2,870 kWH per month, which is equal to an additional four Riverside homes.
  • Saved approximately 250,000 gallons of water, which is equal to the water of eight 20 ft x 40 ft swimming pools. 
  • Due to permeable pavers, about 283,000 gallons of rainfall water is diverted from storm water system per year, which is equal to the water of nine 20 ft x 40 ft swimming pools. 

"We are delighted that this local McDonald's has taken such significant measures to conserve our natural resources while educating residents about the importance of energy conservation," said Ron Loveridge, mayor of Riverside.

Beginning as manager trainee and crewperson, respectively, over the last 40 years Tom and Candace have risen within the ranks of the McDonald's system to own and operate nine McDonald's restaurants in the Inland Empire located in Chino, Ontario, Montclair, Pomona, Riverside and Rubidoux. Both Tom and Candace are members of the McDonald's Operators' Association of Southern California, which is comprised of more than 120 small business owners who operate more than 600 McDonald's restaurants in the counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura. BD+C 

Related Stories

| Feb 2, 2012

VLK Architects selected for new Cypress, Texas elementary school

The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.

| Feb 2, 2012

Mortenson Construction to build 2.4 MW solar project in North Carolina

Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Feb 2, 2012

Fire rated glazing helps historic university preserve its past

When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.

| Feb 2, 2012

Delk joins Gilbane Building Co.

Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.

| Feb 2, 2012

Next phase of construction begins on Scripps Prebys Cardiovascular Institute

$456 million Institute will be comprehensive heart center for 21st Century.

| Feb 1, 2012

Increase notched in construction jobs, but unemployment rate still at 16%

AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.

| Feb 1, 2012

Replacement windows eliminate weak link in the building envelope

Replacement or retrofit can help keep energy costs from going out the window.

| Feb 1, 2012

‘Augmented reality’ comes to the job site

A new software tool derived from virtual reality is helping Building Teams use the power of BIM models more effectively.

| Feb 1, 2012

New ways to work with wood

New products like cross-laminated timber are spurring interest in wood as a structural material.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021