flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

LEED Platinum office complex opens in Morristown

LEED Platinum office complex opens in Morristown


August 11, 2010
This article first appeared in the 200906 issue of BD+C.

The new headquarters for the Geraldine R. Dodge Foundation in Morristown, N.J., is on track to achieve LEED Platinum certification from the U.S. Green Building Council. Designed by Minno & Wasko Architects and Planners, Lambertville, N.J., the $9.5 million building includes four floors of office space and an adjacent 791-space parking deck. Sustainable features include geothermal heating, underfloor air distribution, high-performance lighting systems, automated building controls, photovoltaics, a vegetated roof, and a biowall (pictured). The Building Team also salvaged steel beams and building materials from an Epstein's department store formerly located on the site. Two decorative wood walls featured in the Foundation's office space are made from reused material.

Related Stories

Office Buildings | Jan 29, 2020

Zaha Hadid Architects to build OPPO’s new Shenzhen HQ

ZHA sees your two connected towers and raises you another two.

Wood | Jan 24, 2020

105,000-sf vertical mass timber expansion will cap D.C.’s 80 M Street

Hickok Cole is designing the project.

Office Buildings | Jan 22, 2020

Headspace expands Santa Monica corporate HQ

Montalba Architects designed the project.

Office Buildings | Jan 19, 2020

Internet platform connects its employees with mile-long staircase in new HQ

Color also plays a big role in the interior design of this 19-story building.

Office Buildings | Jan 14, 2020

The workplace should be a tool for improving employee engagement

A survey of 1,600 North American workers hints at what workplace elements have the greatest impact.

Office Buildings | Jan 9, 2020

NFL’s Packers and Microsoft add an innovation center to a fledgling business district

The goal is to nurture startups aligned with local industries.

Office Buildings | Jan 9, 2020

Foster + Partners to design Alibaba’s new offices in Shanghai

The firm won a design competition for the project.

Sponsored | HVAC | Jan 6, 2020

Four Ways Building Systems Create Long-term Profitability

When accounting for the total cost of ownership and the potential return on investment, owners and developers should consider total energy usage, the lifespan of building systems equipment, the recruitment and retention of occupants, and lease rates.

Office Buildings | Oct 28, 2019

LEGO opens the first phase of its new Billund, Denmark campus

C.F. Møller Architects designed the project.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021