flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

LEED Dynamic is worth the effort, says commercial real estate executive

Codes and Standards

LEED Dynamic is worth the effort, says commercial real estate executive

San Diego office tower is California’s first office building to receive LEED Dynamic plaque in recertification.


By Peter Fabris, Contributing Editor | May 25, 2016
LEED Dynamic is worth the effort, says commercial real estate executive

Symphony Tower in San Diego. Photo: Coolcaesar/Wikimedia Commons.

An executive with the Irvine Companies, owner of Symphony Tower, California’s first office building to receive a LEED Dynamic plaque in its recertification, says the work it took to achieve the designation was worth the effort.

Chris Popma told GlobeSt.com that earning the plaque was the result of environmental performance strategies that were measured for effectiveness over time. The rating agency examined total energy usage, total potable water usage for the whole building, total waste generated and diverted from the landfill, transportation surveys from customers, and other factors.

The building was already operating at high environmental performance levels, Popma said, so little additional work was needed. Irvine’s marketing strategy is linked to strong efficiency and sustainability performance, so reaching for the plaque made good business sense. Buildings that do not perform at high levels would require much more investment to achieve LEED Dynamic certification.

Previous LEED certifications gave points for having green items in place, but the green features may not actually be operating optimally. LEED Dynamic looks at the actual data of water and power consumption. The plaque’s performance score is continually updated.

Related Stories

Codes and Standards | Sep 22, 2021

Cities need to step up flood mitigation efforts to save lives

Recent storms highlight climate change dangers.

Codes and Standards | Sep 21, 2021

Steps to improve ventilation for Covid can combat colds and flu

New look at airborne disease spread shows time viruses linger in air may have been underestimated.

Codes and Standards | Sep 15, 2021

USGBC will change leaders, conduct strategic review

Aims to ensure organization is ‘well positioned to scale its work in the post-pandemic world’.

Codes and Standards | Sep 15, 2021

LEED-certified offices earn higher rents than non-sustainable properties

Are also more resilient to dips in real estate market.

Codes and Standards | Sep 7, 2021

Boston turns to developer fees to fund flood protection infrastructure

Assessments on commercial properties will help build seawall and other protective measures.

Codes and Standards | Sep 3, 2021

Low-cost methods can have substantial impact on reducing embodied carbon

Whole-building design, material substitution, and specification strategies can slash carbon by up to 46%.

Codes and Standards | Sep 2, 2021

Case for power resiliency in buildings grows with more disaster and outages

Essential businesses like data centers, hospitals are first adopters of new storage systems.

Codes and Standards | Aug 31, 2021

UK industry group wants mandatory whole-life carbon assessments of buildings

Aims to address hidden emissions embedded in supply chains.

Codes and Standards | Aug 31, 2021

Home electrification will require code upgrades

Residential electric panel capacity must be increased.

boombox1
boombox2
native1

More In Category

Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021