flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

LEED-certified federal buildings don’t use less energy than average

Codes and Standards

LEED-certified federal buildings don’t use less energy than average

May be due to trade-offs on how score is developed.


By Peter Fabris, Contributing Editor | May 13, 2021

Courtesy Pixabay

A new study from Carnegie Mellon University found that LEED-certified federal buildings are not using less energy than non-certified federal buildings.

The finding may be due to trade-offs in how their energy score is developed with energy use being just one of many attributes examined by the LEED program. In some cases, owners and developers may trade off energy savings for other goals to improve design and comfort in buildings.

For example, energy consumption from sensors in water-efficient bathrooms and landscaping systems may reduce building energy efficiency. “If energy efficiency is the primary policy goal, LEED certification may not be the most effective means to reach that goal,” according to the study’s report.

Overall energy consumption also depends on usage. If the building is used more after a renovation, then more energy may be consumed.

The study examined 1990-2019 data from GSA’s Energy Usage Analysis System and the Green Building Information Gateway to consider the impact of LEED certification on federal buildings.

Related Stories

| Jun 21, 2012

String of shattered glass balcony panels prompts call for code reform in Ontario

Since last summer, glass balconies have shattered at 13 different buildings in Toronto.

| Jun 21, 2012

California adds window film to building code

California is the first state to add window film into its building code. Window film, a polymer material, offers cost-effective energy savings.

| Jun 21, 2012

New ISO standard to improve environmental management of concrete

A new ISO standard will help the construction industry better manage the environmental impacts of concrete.

| Jun 21, 2012

On net-zero projects, Building Teams will be held accountable for energy-efficiency performance

The building team will be held accountable for how net-zero energy buildings perform two, five, and maybe ten years after completion.

| Jun 14, 2012

USGBC co-founder launches rating system for building product manufacturers

U.S. Green Building Council co-founder David Gottfried’s new venture, Regenerative Ventures, has established a rating system for building product manufacturers.

| Jun 14, 2012

Green standard set for single-ply roofing membrane

A sustainability standard has been established for single-ply roofing membranes used on commercial buildings.

| Jun 14, 2012

Minnesota Vikings stadium plan gets legislative go-ahead

Legislation that approved the construction of a new billion dollar stadium for the Minnesota Vikings passed the Minnesota legislature.

| Jun 14, 2012

Report alleges New York’s prevailing construction wages are miscalculated, costing billions

A miscalculation in how prevailing wages are calculated in New York reportedly costs the state $3 billion a year in public-infrastructure projects.

| Jun 14, 2012

AGC, other business groups oppose hiring rules for disabled

Business groups have asked the U.S. Department of Labor to reconsider a proposed hiring quota aimed at federal contractors pertaining to people with disabilities.

boombox1
boombox2
native1

More In Category

Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021