flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Leading hotel markets in the U.S. construction pipeline

Market Data

Leading hotel markets in the U.S. construction pipeline

Projects already under construction and those scheduled to start construction in the next 12 months, combined, have a total of 3,782 projects/213,798 rooms and are at cyclical highs.


By Lodging Econometrics | November 12, 2018

In the third quarter of 2018, analysts at Lodging Econometrics (LE) report that the top five markets with the largest total hotel construction pipelines are: New York City with 170 projects/29,630 rooms; Dallas with 157 projects/18,954 rooms; Houston with 150 projects/16,473 rooms; Los Angeles with 141 projects/24,129 rooms; and Nashville with 115 projects/15,179 rooms. 

Projects already under construction and those scheduled to start construction in the next 12 months, combined, have a total of 3,782 projects/213,798 rooms and are at cyclical highs. Markets with the greatest number of projects already in the ground and those scheduled to start construction in the next 12 months are New York with 145 projects/24,675 rooms, Dallas with 112 projects/13,854 rooms, Houston with 103 projects/11,562 rooms, Los Angeles with 92 projects/14,249 rooms, and Nashville with 88 projects/12,322 rooms. 

In the third quarter, Los Angeles has the highest number of new projects announced into the pipeline with 22 projects/6,457 rooms. Detroit follows Los Angeles with 18 projects/1,937 rooms, Dallas with 14 projects/1,529 rooms, New York City with 12 projects/1,857 rooms, and then Atlanta with 12 projects/1,354 rooms. 

Reflecting the strong cyclical highs in the pipeline, LE’s forecast for new hotel openings will continue to rise in 2018-2020. In 2018, New York City tops the list with 29 new hotels expected to open/5,351 rooms, Dallas with 29 projects/3,187 rooms, Houston with 27 projects/3,259 rooms, Nashville with 22 projects/3,018 rooms, and Los Angeles with 12 projects/2,152 rooms. In the 2019 forecast, New York continues to lead with the highest number of new hotels expected to open with 59 projects/8,964 rooms followed by Houston with 31 projects/3,098 rooms and Dallas with 30 projects/3,379 rooms. In 2020, Dallas is forecast to take the lead for new hotel openings with 41 projects/4,809 rooms expected to open, followed by New York with 36 projects/5,978 rooms, and Los Angeles with 33 projects/4,292 rooms expected to open.  

With the exception of New York City and Houston, the other markets mentioned in the opening show that supply growth has begun to surpass demand. The variances in 2018 year-to-date are small but are certain to widen in the next two years, given the strength of these pipeline in the markets. 

All in all, 10 of the top 25 markets show supply growth minimally exceeding demand growth in 2018.

Related Stories

Market Data | Jul 1, 2020

7 must reads for the AEC industry today: July 1, 2020

Facebook to build $800 million data center and 329 metro areas added construction jobs in May.

Market Data | Jun 30, 2020

AIA releases strategies and illustrations for reducing risk of COVID-19 in senior living communities

Resources were developed as part of AIA’s “Reopening America: Strategies for Safer Buildings” initiative.

Market Data | Jun 30, 2020

329 metro areas added construction jobs in May

Seattle-Bellevue-Everett, Wash. added the most construction jobs (28,600, 44%) in May.

Market Data | Jun 29, 2020

6 must reads for the AEC industry today: June 29, 2020

HQ tower features gardens on every floor and the head of Hilton talks about how his business will survive.

Market Data | Jun 26, 2020

5 must reads for the AEC industry today: June 26, 2020

Restoration of 1930s El Paso hotel completes and Arc offers tools, analytics for safe workplace re-entry.

Market Data | Jun 25, 2020

Commercial Construction Index drops amid Coronavirus pandemic, but contractors poised for near-term recovery

Contractors quickly prioritized worker health and safety, and 1 in 3 plan to hire more workers in the next 6 months.

Market Data | Jun 25, 2020

7 must reads for the AEC industry today: June 25, 2020

CDC to build the most advanced high containment laboratory in the country and architecture billings downward trajectory moderates.

Market Data | Jun 24, 2020

Architecture billings downward trajectory moderates

AIA’s Architecture Billings Index (ABI) score for May was 32.0 compared to 29.5 in April, but still represents a significant decrease in services provided by U.S. architecture firms.

Market Data | Jun 24, 2020

8 must reads for the AEC industry today: June 24, 2020

San Francisco's apartment market goes in reverse and WATG designs a solution for isolating without sacrificing social connectivity.

Market Data | Jun 23, 2020

National survey reveals pandemic's impact on college students' mental health, remote learning, families' income and more

Of 2,500 student respondents, 75% feel more anxious or stressed, 57% said they lost their summer jobs and 90% want to return to campus in the fall.

boombox1
boombox2
native1

More In Category


Contractors

Nonresidential construction spending decreased 0.2% in June

National nonresidential construction spending declined 0.2% in June, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.21 trillion. Nonresidential construction has expanded 5.3% from a year ago.



Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021