flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

At last, downtown Dallas tower to get $450 million redo

Multifamily Housing

At last, downtown Dallas tower to get $450 million redo

Landmark tower, vacant for a decade, will get a mix of apartments, hotel, restaurants, and retail.


By By Robert Cassidy, Editor, Multifamily Design+Construction | May 17, 2019

A crew from Andres Construction Services performs work on the adaptive reuse of First National Bank Tower, Dallas, into apartments, restaurants, retail, and the 200-room Texas flagship inn for Thompson Hotels. Photo: Andres Construction Services

After a decade of starts and stops, the 1.5 million-sf First National Bank Tower—which occupies the largest vacant block in the core of downtown Dallas—is to be redeveloped. Todd Interests is the new developer. Andres Construction Services is the GC. Merriman Anderson Architects is the design firm.

Work on the 52-story tower at 1401 Elm Street quietly began ramping back up in recent days, while the deal with Todd Interests was still being ironed out. That’s because the project must hit a completion target of year-end 2020 to qualify for millions in entitlements.

According to a May 8, 2019, report by Jeremiah Jensen in Commercial Real Estate, the redevelopment will focus on four uses: apartments, hotel, restaurants, and retail. A 200-room hotel, which will serve as a Texas flagship for Thompson Hotels, is scheduled to open in September 2020. The residential component will feature 318 luxury apartments, including some on the 48th floor—the highest in downtown Dallas.

The landmark tower has been vacant for a decade, according to a report by Steve Brown, RE Editor of the Dallas News. Todd Interests is the fifth owner to tackle redevelopment of the 1960s office tower, which is the largest empty building downtown.

Related Stories

Architects | Oct 27, 2015

Top 10 tile trends for 2016

Supersized tile and 3D walls are among the trending tile design themes seen at Cersaie, an exhibition of ceramic tile and bathroom furnishings held in Bologna, Italy in October.

Multifamily Housing | Oct 27, 2015

Multifamily building in downtown Montreal is being built from the roof down

The method eliminates the need for scaffolding and cranes.

Modular Building | Oct 22, 2015

My Micro NY will soon be New York's first micro-apartment building

The Manhattan modular building will be completed in December and will contain apartments with low rents, but small space.

Architects | Oct 20, 2015

Four building material innovations from the Chicago Architecture Biennial

From lightweight wooden pallets to the largest lengths of CLT-slabs that can be shipped across North America

Multifamily Housing | Oct 20, 2015

Builder confidence rises on multifamily’s strength

Starts and completions were up solidly in September, but permits are leveling off. 

Multifamily Housing | Oct 16, 2015

Textile factory turned multifamily has train tracks running through it

The Counting House Lofts is a 200-year-old building that still has its train tracks, exterior train bay doors, and a watch house tower.

Multifamily Housing | Oct 15, 2015

Montreal apartment is world’s largest residential cross-laminated timber project

 Its 434 condo, townhouse, and rental units in three eight-story buildings are made from sustainably harvested wood turned into panels by Canadian company Nordic Wood Structures together with the Cree Nation in Chibougamau.

Sponsored | Multifamily Housing | Oct 15, 2015

Apartment takes progressive turn in architecturally traditional D.C.

The new Lyric 440K Apartments is a 14-story structure housing 234 one- and two-bedroom units in the heart of D.C.'s up-and-coming Mount Vernon Triangle

Multifamily Housing | Oct 12, 2015

Freddie Mac: Multifamily demand should outpace supply through 2016

Vacancy rates and rent growth are “converging” in most markets.

Multifamily Housing | Oct 7, 2015

BIG designs lush, terraced mixed-use building in Sweden

Cascading glass and wooden cubes create a form similar to Northern Ireland’s Giant’s Causeway rock formation.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021