flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

At last, downtown Dallas tower to get $450 million redo

Multifamily Housing

At last, downtown Dallas tower to get $450 million redo

Landmark tower, vacant for a decade, will get a mix of apartments, hotel, restaurants, and retail.


By By Robert Cassidy, Editor, Multifamily Design+Construction | May 17, 2019

A crew from Andres Construction Services performs work on the adaptive reuse of First National Bank Tower, Dallas, into apartments, restaurants, retail, and the 200-room Texas flagship inn for Thompson Hotels. Photo: Andres Construction Services

After a decade of starts and stops, the 1.5 million-sf First National Bank Tower—which occupies the largest vacant block in the core of downtown Dallas—is to be redeveloped. Todd Interests is the new developer. Andres Construction Services is the GC. Merriman Anderson Architects is the design firm.

Work on the 52-story tower at 1401 Elm Street quietly began ramping back up in recent days, while the deal with Todd Interests was still being ironed out. That’s because the project must hit a completion target of year-end 2020 to qualify for millions in entitlements.

According to a May 8, 2019, report by Jeremiah Jensen in Commercial Real Estate, the redevelopment will focus on four uses: apartments, hotel, restaurants, and retail. A 200-room hotel, which will serve as a Texas flagship for Thompson Hotels, is scheduled to open in September 2020. The residential component will feature 318 luxury apartments, including some on the 48th floor—the highest in downtown Dallas.

The landmark tower has been vacant for a decade, according to a report by Steve Brown, RE Editor of the Dallas News. Todd Interests is the fifth owner to tackle redevelopment of the 1960s office tower, which is the largest empty building downtown.

Related Stories

Multifamily Housing | Apr 3, 2019

Multifamily rent growth hits two-year high in February, rising 3.6%

A survey of 127 major U.S. real estate markets by Yardi Matrix shows no signs of slowing for multifamily rental demand.

Multifamily Housing | Mar 24, 2019

New York’s largest office-to-condo conversion nearing completion

One Wall Street will feature 100,000 sf of amenities and a three-level Whole Foods.

Building Tech | Mar 13, 2019

Almost everything you wanted to know about industrial construction

Our experts offer 15 tips on how best to perform factory-based construction.

Multifamily Housing | Mar 11, 2019

Kaiser Permanente takes aim at reducing chronic homelessness

Initiatives include a multimillion-dollar investment fund, and collaborating with a group that works with communities to house the unsheltered.

Multifamily Housing | Mar 6, 2019

MLK Plaza brings 167 units of affordable housing to the Bronx

The project was financed by the City’s ELLA program.

Multifamily Housing | Feb 26, 2019

275-unit residential building under construction at 2111 S. Wabash

Solomon Cordwell Buenz is designing the project.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021