flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

LA's U.S. Bank Tower to build exterior glass slide leading from 70th to 69th floors

High-rise Construction

LA's U.S. Bank Tower to build exterior glass slide leading from 70th to 69th floors

The glass slide, part of a $50 million renovation project, will stretch 45 feet along the exterior of the building.


By David Malone, Associate Editor | March 3, 2016

Image courtesy OUE Skyspace LA

Observation decks with glass bottoms are all the rage. The Grand Canyon, Willis Tower, and Tower Bridge have all incorporated some sort of viewing deck with a glass bottom. It isn’t enough to just look out over a great expanse from up high anymore. Now, thrill seeking tourists want to be able to step out over vertigo-inducing heights and feel like a super hero floating above their city.

But a new glass bottom project in Los Angeles is looking to make floating in place in the sky passé and is upping the ante with a glass bottom structure that puts people in a more active role.

The U.S. Bank Tower, the tallest building in downtown Los Angeles, is getting ready to introduce tourists to the Skyslide: a 45-foot-long, four-foot-wide glass-bottomed slide suspended about 1,000 feet above the city streets on the exterior of the building.

For $8, customers will be able to enter the slide from the 70th floor and slide down to the observation deck on the 69th floor. The observation deck is the tallest open-air observation deck in California.

According to Overseas Union Enterprises Ltd, who owns the building, the slide is expected to open in June 2016. If glass bottom attractions already in place in other structures around the world are any indication, U.S. Bank Tower’s Skyslide is going to be very popular.

For more on the entire project, click here.

Related Stories

| Apr 25, 2012

McCarthy introduces high school students to a career in construction

High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.

| Apr 24, 2012

ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014

Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.

| Apr 20, 2012

McCarthy completes Santa Barbara Cottage Hospital Replacement Facility

The new hospital’s architectural design combines traditional Santa Barbara Spanish colonial architecture with 21st century medical conveniences highlighted by a therapeutic and sustainable atmosphere.

| Apr 16, 2012

Freeland promoted to vice president at Heery International

Recently named to Building Design+Construction’s 40 Under 40 Class of 2012.

| Apr 16, 2012

Drake joins EYP as science and technology project executive

Drake’s more than 30 years of diversified design and project delivery experience spans a broad range of complex building types.

| Apr 10, 2012

JE Dunn completes two medical office buildings at St. Anthony’s Lakewood, Colo. campus

Designed by Davis Partnership Architects, P.C., Medical Plaza 1 and 2 are four-story structures totaling 96,804-sf and 101,581-sf respectively.

| Apr 4, 2012

HDS designs Mount Auburn Hospital’s new healthcare center in Waltham, Mass.

HDS Architecture provided design services for all the Mount Auburn Healthcare suites including coordination of HVAC and FP engineering.

| Apr 3, 2012

Suffolk completes phase one of Baystate Medical Center expansion

Construction management firm awarded emergency department project for successful build of $296 million MassMutual Wing and Davis Family Heart and Vascular Center.

| Mar 28, 2012

Holden Cancer Center opens at University of Iowa Hospitals and Clinics

The new cancer clinic provides a significant increase in patient space from the prior facility, which was located in an adjacent building.

| Mar 28, 2012

Tsoi/Kobis & Associates developing master plan for UT Southwestern Medical Center

Firm will spearhead strategies for transforming existing in-patient hospital into state-of-the-art ambulatory care facility.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

U.S. healthcare building sector trends and innovations for 2024-2025

As new medicines, treatment regimens, and clinical protocols radically alter the medical world, facilities and building environments in which they take form are similarly evolving rapidly. Innovations and trends related to products, materials, assemblies, and building systems for the U.S. healthcare building sector have opened new avenues for better care delivery. Discussions with leading healthcare architecture, engineering, and construction (AEC) firms and owners-operators offer insights into some of the most promising directions. This course is worth 1.0 AIA/HSW learning unit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021