flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Codes and Standards

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Parallel Design-Permitting Process includes flagging elements for correction during conceptual design.


By Peter Fabris, Contributing Editor | January 14, 2020

Courtesy Pixabay

The completion of the $1 billion Metropolis development in downtown Los Angeles was aided by the city’s streamlined permitting process, according to the developer.

With the recent completion of the 56-story, 650-unit condominium tower Thea, the development provides 1,500 residences, 350 hotel rooms, and 70,000 sf of retail space. The 6.3-acre Metropolis project broke ground in 2014. Two residential towers, one in 2017 and one in 2018, as well as the Hotel Indigo, are already open.

The developer, Greenland USA, says Los Angeles Department of Buildings and Safety’s Parallel Design-Permitting Process helped it complete the project efficiently and on time. The program allows plan inspectors to check and identify elements that need correction during the conceptual design phase.

Among the benefits to the program:

· Reduces design revisions

· Earlier approvals from other agencies

· Reduced permit processing time

· Earlier starts for contractors   

· Cost savings from a shorter construction timeline

Related Stories

Codes and Standards | Mar 20, 2020

Feds prod use of eminent domain to force people out of flood-prone homes

Local officials that don’t comply could lose federal money to combat climate change.

Codes and Standards | Mar 19, 2020

ASHRAE provides COVID-19 resources for operating, maintaining HVAC systems

Includes recently approved position document on Airborne Infectious Diseases.

Codes and Standards | Mar 19, 2020

CaGBC launches new version of its Zero Carbon Building Standard

Version 2 draws on lessons from more than 20 zero carbon projects.

Codes and Standards | Mar 16, 2020

Concrete industry reduces carbon footprint by 13% over five years

Result mostly due to more efficient use of Portland cement.

Resiliency | Mar 13, 2020

Feds push use of eminent domain to force people out of flood-prone homes

Local officials that don’t comply could lose federal money to combat climate change.

Codes and Standards | Mar 12, 2020

Design guide for sloped glazing and skylights updated for first time in 30 years

Helps with choosing proper glass for non-residential applications.

Codes and Standards | Mar 11, 2020

Two tree species native to the Northeast found suitable for CLT

Eastern white pine and eastern hemlock pass strength testing.

Codes and Standards | Mar 10, 2020

Prescient receives ICC certification for seismic resilience system

Technology suitable for buildings up to 12 stories in earthquake-prone areas.

Codes and Standards | Mar 6, 2020

Design firms creating plans to re-imagine D.C.’s tidal basin

Area including National Mall is facing increased flood risk.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021