flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Codes and Standards

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Parallel Design-Permitting Process includes flagging elements for correction during conceptual design.


By Peter Fabris, Contributing Editor | January 14, 2020

Courtesy Pixabay

The completion of the $1 billion Metropolis development in downtown Los Angeles was aided by the city’s streamlined permitting process, according to the developer.

With the recent completion of the 56-story, 650-unit condominium tower Thea, the development provides 1,500 residences, 350 hotel rooms, and 70,000 sf of retail space. The 6.3-acre Metropolis project broke ground in 2014. Two residential towers, one in 2017 and one in 2018, as well as the Hotel Indigo, are already open.

The developer, Greenland USA, says Los Angeles Department of Buildings and Safety’s Parallel Design-Permitting Process helped it complete the project efficiently and on time. The program allows plan inspectors to check and identify elements that need correction during the conceptual design phase.

Among the benefits to the program:

· Reduces design revisions

· Earlier approvals from other agencies

· Reduced permit processing time

· Earlier starts for contractors   

· Cost savings from a shorter construction timeline

Related Stories

Resiliency | May 2, 2016

Connecticut to develop new code standards for resiliency

Expected more frequent severe weather events due to climate change prompts review.  

Contractors | Apr 29, 2016

OSHA issues advisory to protect workers from Zika virus

Construction industry workers considered at high risk.  

Codes and Standards | Apr 28, 2016

New research finds 30 measures to significantly cut energy use

ASHRAE’s prescription cuts across all building types and climates.  

Codes and Standards | Apr 27, 2016

Florida gives developers more time to install first responder radio signal systems

Expensive upgrades can be postponed for several years.  

Codes and Standards | Apr 25, 2016

San Francisco becomes first big U.S. city to require solar panels on new buildings

Pertains to commercial and residential buildings shorter than 10 stories.  

Codes and Standards | Apr 25, 2016

GSA adopts SITES land development and management rating system

Federal agency will use for properties with and without buildings.  

Wood | Apr 22, 2016

Revised 2015 Manual for Engineered Wood Construction available

American Wood Council Document offers design information for structural applications.

Codes and Standards | Apr 18, 2016

Efficiency finance pilot project to spur retrofits on existing buildings

EDF and PG&E team up on interest-free loans for qualified projects.  

Codes and Standards | Apr 18, 2016

ASHRAE releases proposed energy standard for historic buildings

Designed to balance with preservation requirements.  

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021