flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Codes and Standards

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Parallel Design-Permitting Process includes flagging elements for correction during conceptual design.


By Peter Fabris, Contributing Editor | January 14, 2020

Courtesy Pixabay

The completion of the $1 billion Metropolis development in downtown Los Angeles was aided by the city’s streamlined permitting process, according to the developer.

With the recent completion of the 56-story, 650-unit condominium tower Thea, the development provides 1,500 residences, 350 hotel rooms, and 70,000 sf of retail space. The 6.3-acre Metropolis project broke ground in 2014. Two residential towers, one in 2017 and one in 2018, as well as the Hotel Indigo, are already open.

The developer, Greenland USA, says Los Angeles Department of Buildings and Safety’s Parallel Design-Permitting Process helped it complete the project efficiently and on time. The program allows plan inspectors to check and identify elements that need correction during the conceptual design phase.

Among the benefits to the program:

· Reduces design revisions

· Earlier approvals from other agencies

· Reduced permit processing time

· Earlier starts for contractors   

· Cost savings from a shorter construction timeline

Related Stories

Codes and Standards | Jun 29, 2017

Fire codes prevent cladding used on Grenfell Tower from being used in U.S.

Reports suggest an extra $6,300 for fire-resistant cladding could have prevented the tragedy.

Codes and Standards | Jun 28, 2017

Minimum Design Loads and Associated Criteria for Buildings and Other Structures, Standards ASCE/SEI 7-16, has been updated

The document is used for determining design loads including dead, live, soil, flood, tsunami, snow, rain, atmospheric ice, earthquake, wind, and fire.

Codes and Standards | Jun 27, 2017

Cold-formed steel framing engineering guide for building projects released

Better sound attenuation for subfloors and exterior continuous insulation are among the matters addressed.

Codes and Standards | Jun 26, 2017

L.A.’s new ordinance requires energy and water efficiency benchmarking

Structures 20,000 sf and larger must demonstrate steps to boost efficiency.

Codes and Standards | Jun 21, 2017

World Green Building Council: All buildings must be net zero by 2050 to avert 2°C rise

Building efficiency essential to tempering global climate change.

Codes and Standards | Jun 21, 2017

Senate bill would prohibit tax money for sports stadium projects

Bipartisan legislation would prevent use of municipal bonds by pro teams.

Codes and Standards | Jun 19, 2017

Developer, architect hit with $10 million construction defect verdict

Case pertained to construction of condo development that was not fire code-compliant.

Codes and Standards | Jun 15, 2017

Cornell Tech unveils plans to reach Net Zero at The Bloomberg Center

Campus plans include photovoltaic arrays and geothermal ground source heat pumps.

Codes and Standards | Jun 13, 2017

Canada Green Building Council and Green Business Certification Inc. announce partnership

New joint venture will deliver enhanced services and support tools and programs throughout Canada.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021