flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The largest timber office building in the U.S. will anchor Newark, N.J. mixed-use development

Wood

The largest timber office building in the U.S. will anchor Newark, N.J. mixed-use development

Michael Green Architecture is designing the building.


By David Malone, Associate Editor + John Caulfield, Senior Editor | February 5, 2018

Courtesy Michael Green Architecture/Lotus Equity Group

Riverfront Square, a proposed 11.8-acre mixed-use development in Newark, N.J. will include a 500,000-sf timber office building. According to Michael Green Architecture, the building’s architect, and New York-based real estate development and investment firm Lotus Equity Group, the new structure would be the largest timber office building in the country when it completes construction.

Timber-built buildings are more environmentally friendly than buildings constructed with traditional materials. Manfactured steel and concrete, which are typically secondary materials within a mass timber building, account for an estimated 10% of greenhouse gas emissions worldwide. “The vision we share with Michael Green is to design the most environmentally sustainable office tower that enhances the health of tenants and the surrounding communities through efficient planning and green design,” says Ben Korman, Chief Executive Officer and Founder of Lotus Equity Group, in a release.

 

Exterior of mass timber building

Courtesy Michael Green Architecture/Lotus Equity Group.

 

Riverfront Square is expected to provide up to 2,000 residential units, large- and small-scale retail, cultural and public open space, a hotel, 2 million sf of office space, and parking spaces in the heart of downtown Newark. The proposed site is adjacent to the waterfront and NJ Transit’s Broad Street train station, which can deliver riders to Midtown Manhattan in 18 minutes.

In an interview with BD+C this afternoon, Korman said his firm has been developing and building in Newark for a dozen years, and has a working partnership with the longtime owner of 2 Gateway Center, which at 800,000 sf is the city's largest office building. “We understand the dynamics and the history of Newark, and after analyzing the market came to the conclusion that the central business district was in need of significant housing.”  He believes that Newark—which is among the 20 cities vying for Amazon's second headquarters—is poised for growth.

 

Courtesy Michael Green Architecture/Lotus Equity Group.

 

The decision to use mass timber for the office building was made, he said, about a year ago, “close to when we started the design process.” He said his firm “wanted [the building] to be a project of the future: affordable and sustainable, with a lower carbon footprint.” Lotus is also exploring using mass timber to build some of the residential component of Riverfront Square, too.

The 500,000-sf mass timber office building will be three interconnected sections, at heights of six, eight, and 11 stories, respectively. Amenities will include open spaces on the roof and ground floor of the building. In fact, five of Riverfront Square's 11.8 acres would be open space, some of which would connect with the city's existing parks.

 

Courtesy Michael Green Architecture/Lotus Equity Group.

 

Michael Green Architecture, based in Vancouver, B.C., has worked on several mass-timber projects, including the seven-story 220,000-sf T3 Minneapolis and the eight-story, 97-foot-tall Wood Innovation & Design Centre in Prince George, B.C. It is one of four architects with which Lotus is working on the Newark office project, the others being TEN Arquitectos, Practice for Architecture and Urbanism, and Minno & Wasko Architects and Planners.

Lotus needs to find a tenant before this project moves forward (it hasn't picked a general contractor yet, either). But when that happens construction should take about 20 months, said Korman, who added that the city of Newark is encouraging this kind of commercial and residential development. “They are a pleasure to do business with.”  

 

Courtesy Michael Green Architecture/Lotus Equity Group.

 

Rendering of the exterior of the timber buildingCourtesy Michael Green Architecture/Lotus Equity Group.

Related Stories

Mass Timber | Jun 26, 2024

Oregon State University builds a first-of-its-kind mass timber research lab

In Corvallis, Oreg., the Jen-Hsun Huang and Lori Mills Huang Collaborative Innovation Complex at Oregon State University aims to achieve a distinction among the world’s experimental research labs: It will be the first all-mass-timber lab meeting rigorous vibration criteria (2000 micro-inches per second, or MIPS).

Mass Timber | Jun 17, 2024

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

Mass Timber | Jun 10, 2024

5 hidden benefits of mass timber design

Mass timber is a materials and design approach that holds immense potential to transform the future of the commercial building industry, as well as our environment. 

Products and Materials | May 31, 2024

Top building products for May 2024

BD+C Editors break down May's top 15 building products, from ​​​​​​​Durat and CaraGreen's Durat Plus to Zurn Siphonic Roof Drains.

Construction Costs | May 31, 2024

Despite challenges, 2024 construction material prices continue to stabilize

Gordian’s Q2 2024 Quarterly Construction Cost Insights Report indicates that supply chain issues notwithstanding, many commodities are exhibiting price normalization.

Mass Timber | May 22, 2024

3 mass timber architecture innovations

As mass timber construction evolves from the first decade of projects, we're finding an increasing variety of mass timber solutions. Here are three primary examples.

Mass Timber | May 8, 2024

Portland's Timberview VIII mass timber multifamily development will offer more than 100 affordable units

An eight-story, 72,000-sf mass timber apartment building in Portland, Ore., topped out this winter and will soon offer over 100 affordable units. The structure is the tallest affordable housing mass timber building and the first Type IV-C affordable housing building in the city. 

Mass Timber | Apr 25, 2024

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.

ProConnect Events | Apr 23, 2024

5 more ProConnect events scheduled for 2024, including all-new 'AEC Giants'

SGC Horizon present 7 ProConnect events in 2024.

75 Top Building Products | Apr 22, 2024

Enter today! BD+C's 75 Top Building Products for 2024

BD+C editors are now accepting submissions for the annual 75 Top Building Products awards. The winners will be featured in the November/December 2024 issue of Building Design+Construction. 

boombox1
boombox2
native1

More In Category


Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021