flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The largest dowel laminated timber project in North America begins construction in Des Moines

Wood

The largest dowel laminated timber project in North America begins construction in Des Moines

The building will feature a unique “shou sugi ban” charred wood exterior.


By David Malone, Associate Editor | August 24, 2018
111 East Grand exterior

Courtesy Ryan Companies

111 East Grand, a 66,800-sf, four-story multi-use building, is currently under construction in Des Moines. The building is the largest dowel laminated timber (DLT) project in North America. DLT, manufactured by StructureCraft, will be used for the floor and roof assemblies. The columns and beams will be made from glue laminated timber.

DLT panels are made from stacked softwood lumber boards that are friction-fit together using hardwood dowels. DLT doesn’t contain any glue, VOCs, or metal nails, meaning there is no off-gassing.

 

See Also: First mass timber panel made from structural composite lumber gets APA certification

 

The project is a collaborative development between JSC Properties, Rypma Properties, Christensen Development, and Ryan Companies. In addition to working on the project, Ryan Companies will also be one of the building’s first tenants as the firm will move its Des Moines office team into the project. Three additional tenants have secured leases as well: Neumann Monson Architects (the architect of record for the project), St. Kilda Surf + Turf, and West Financial Advisors.

The project is slated for completion in Spring 2019.

Tags

Related Stories

Wood | Mar 28, 2016

Waugh Thistleton designs one of the tallest timber office buildings in London

The nine-story Development House has vertical open spaces for light and air flow.  

Wood | Mar 23, 2016

APA updates Engineered Wood Construction Guide

Provides recommendations on engineered wood construction systems.

Wood | Feb 8, 2016

BEST IN WOOD: WoodWorks announces 2016 design award winners

The Aspen Art Museum, Scott Family Amazeum, and Whitetail Woods Regional Park Camper Cabins are among the projects honored by this year’s awards.

Wood | Feb 3, 2016

American Wood Council releases guide to wood construction in high wind areas

The guide is directed toward ensuring structural integrity to resist wind loads.

Wood | Jan 4, 2016

Concerns over new wood-frame, mid-rise residential building construction in Charlotte

Cheaper construction material may increase risk for firefighters.

Sponsored | Wood | Dec 7, 2015

Compelling conversations about wood: Engineered wood as expressive design

This installment features a wide-ranging discussion that reveals how a mix of engineered wood products lend themselves to expressive design — and what’s blocking today’s designers from fully embracing this aesthetic.

Wood | Nov 24, 2015

2015 Code Conforming Wood Design publication now available

Summarizes provisions in the 2015 International Building Code.

Sponsored | | Nov 20, 2015

Schooling the visitor

Exposed glulam and other engineered wood products help WSU tell its technology story

Architects | Oct 20, 2015

Four building material innovations from the Chicago Architecture Biennial

From lightweight wooden pallets to the largest lengths of CLT-slabs that can be shipped across North America

Multifamily Housing | Oct 15, 2015

Montreal apartment is world’s largest residential cross-laminated timber project

 Its 434 condo, townhouse, and rental units in three eight-story buildings are made from sustainably harvested wood turned into panels by Canadian company Nordic Wood Structures together with the Cree Nation in Chibougamau.

boombox1
boombox2
native1

More In Category


Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021