flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

‘Landmark study’ offers key recommendations for design-build delivery

Codes and Standards

‘Landmark study’ offers key recommendations for design-build delivery

Clarity about risk allocation is paramount.


By Peter Fabris, Contributing Editor | October 26, 2022
Design Build Delivery
Courtesy Pexels.

The ACEC Research Institute and the University of Colorado Boulder released what the White House called a “landmark study” on the design-build delivery method.

Design Build State of Practice: Recommendations for Agencies and Industry on Effective Project Delivery provides recommendations to firms and project owners, including federal agencies and industry, on successful delivery as well as new information to enhance the benefits of cost and schedule savings associated with design-build.

“The key to success in design-build delivery is clear communication early in the partnership process,” said Keith Molenaar, University of Colorado Boulder, in a news release. “While our research shows that size, risk transfer, and long-term relationship building are vital elements of successful contracts, clarity about risk allocation above all else has to be reached so the project work can progress with confidence across all project participants.”

“Over the past several years, implementation of design-build contracts has grown without showing signs of slowing,” said John Carrato, ACEC Research Institute Chair. “While certain projects do well with design build, the study highlighted significant challenges with larger infrastructure projects, which should get the attention of our DOT clients and others working to deliver projects under the bipartisan infrastructure law.”

Related Stories

Codes and Standards | Aug 13, 2015

Proposed facility smart grid standard open for public review

Goal is common way to describe, manage, communicate about electrical energy consumptions, forecasts

Codes and Standards | Aug 6, 2015

AAMA updates methods for testing of exterior walls

The standard specifies test methods, specifications, and field checks to evaluate structural adequacy of exterior wall systems composed of curtain walls, storefronts, and sloped glazing.

Codes and Standards | Aug 6, 2015

Difference in male-female thermal comfort is due to clothing, ASHRAE says

Women wear lighter clothing in the summer, so they tend to be cooler in air-conditioned rooms, according to the group.

Codes and Standards | Aug 6, 2015

ConsensusDocs releases new CM agency contract standard agreement

For use when owner acts as the construction manager, hires a construction manager, or uses multiple prime contractors

Codes and Standards | Jul 31, 2015

AIA, International Code Council reach collaborative agreement on building codes

The deal covers a wide range of initiatives, including code development, compliance, and sustainability.

Codes and Standards | Jul 31, 2015

2015 gypsum fire resistance design manual released

The 2015 edition contains nearly 100 new systems that supplement existing assemblies for walls and partitions, floor-ceiling systems, area separation walls, and many others.

Codes and Standards | Jul 27, 2015

New York City changing zoning rules to reduce shadows cast by high rises

For decades, the New York City’s zoning rules have made it hard to construct high-rise buildings that seem airy and minimize the shadows they cast. The city planning department is now working to change that.

Codes and Standards | Jul 27, 2015

ICC, ASHRAE outline roles to consolidate IgCC and 189.1

"IgCC Powered by 189.1” will provide the design and construction industry with “the single, most-effective way to deliver sustainable, resilient, high-performance buildings," according to the trade groups behind the agreement.

Codes and Standards | Jul 27, 2015

Tennessee county considers local worker requirement on construction projects

A proposed amendment to the charter governing Nashville and Davidson County would mandate that 40% of work hours on city- or county-funded construction jobs costing at least $100,000 be completed by residents.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021