flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

L.A. Dodgers announce $100 million renovation plan for Dodger Stadium

Sports and Recreational Facilities

L.A. Dodgers announce $100 million renovation plan for Dodger Stadium

The renovations will be completed before the 2020 season.


By David Malone, Associate Editor | July 25, 2019

All renderings courtesy of the Los Angeles Dodgers.

According to the Los Angeles Times, the Los Angeles Dodgers have announced plans for a $100 million renovation project this offseason that will create a new center field plaza, elevators, and bridges that will connect the outfield pavilions to the rest of the stadium. This will allow people to walk 360 degrees around the stadium for the first time.

The new centerfield plaza will comprise two acres and include food options, a beer garden, two sports bars, a children’s play area, and space for live music. Fans will be able to watch the game from the plaza via standing positions around the seating areas and from above a new batter’s eye. Elevators and escalators located in the left and right field plazas will allow all spectators access to the new central plaza, regardless of ticket location.

 

 

New restrooms, enclosed bars with views into the bullpens, better seating for individuals with disabilities, and “home run seats” that fill a gap between the outfield wall and the pavilion seats are also part of the renovation project in the left and right field pavilions, and the existing speaker tower will be replaced with a new sound system.

 

See Also: Design goooals for football stadiums: Lessons from the U.K. and the U.S.

 

Additionally, a new Sandy Koufax statue will stand alongside a relocated Jackie Robinson statue at the entrance to the centerfield plaza. The project, which the Dodgers are calling the stadium’s “front door,” is slated for completion before the 2020 season begins.

 

 

Open field play area beyond centerfield pavilion

 

New bar and food area in dodger stadium

 

Related Stories

| Sep 22, 2014

4 keys to effective post-occupancy evaluations

Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.

| Sep 22, 2014

Sound selections: 12 great choices for ceilings and acoustical walls

From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products. 

| Sep 17, 2014

Atlanta Braves break ground on mixed-use ballpark development

SunTrust Park will be constructed by American Builders 2017, a joint venture between Brasfield & Gorrie, Mortenson Construction, Barton Malow Company, and New South Construction.

| Sep 9, 2014

Using Facebook to transform workplace design

As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.

| Sep 3, 2014

New designation launched to streamline LEED review process

The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.

| Sep 2, 2014

Ranked: Top green building sector AEC firms [2014 Giants 300 Report]

AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms. 

| Aug 29, 2014

The new College Football Hall of Fame opens in Atlanta

Adjacent to the Georgia World Congress Center and Centennial Olympic Park, the three-story, 94,250-sf attraction is designed to celebrate the traditions of college football. 

| Aug 27, 2014

Ranked: Top sports facility sector AEC firms [2014 Giants 300 Report]

Populous, AECOM, and Turner head BD+C's rankings of the nation's largest sports facility design and construction firms, as reported in the 2014 Giants 300 Report.

| Aug 27, 2014

Survey of NCAA athletic directors reveals strong demand for new facilities, fan amenities

More than 80% of college athletic directors plan to make significant investments in facilities over the next five years to target potential recruits and spectators, according to a new survey by AECOM and Ohio University.

| Aug 20, 2014

WELL Building: The next step in green sports construction

The WELL Building Standard, a new protocol that focuses on human wellness within the built environment, is a particularly good fit for sports facilities, write Skanska's Tom Tingle and Beth Heider.

boombox1
boombox2
native1

More In Category




Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021