flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

LA Clippers unveil $1.8 billion Intuit Dome

Arenas

LA Clippers unveil $1.8 billion Intuit Dome

AECOM is the lead designer for the project.


By David Malone, Managing Editor | September 20, 2021
LA Clippers Intuit Dome aerial rendering
Renderings courtesy Los Angeles Clippers

Intuit Dome, the future home of the Los Angeles Clippers, has broken ground in Inglewood, Calif. adjacent to the recently completed SoFi Stadium. The project’s goal is to create a technologically advanced arena, entertainment venue, and outdoor plaza that will deliver a uniquely intimate and intense experience.

The project, which will hold approximately 18,000 people, is designed for optimal and intimate engagement with the community and fans. The facility will feature a visually dynamic and structurally efficient silhouette that will be defined by a steel frame with diagrid geometry, inspired by the form of a basketball net as a ball passes through it.

Intuit Dome interior

Intuit Dome will take advantage of the Southern California climate via an indoor-outdoor approach that will allow for a naturally ventilated entrance and upper concourse. A solar-optimized building shell will balance natural light and solar heat gain.

SEE ALSO: The rise of entertainment districts and the inside-out stadium

In addition to AECOM, the core design team includes Anderson Barker Architects, Hood Design Studio, City Design Studio, Walter P. Moore, Henderson Engineering, and Labib Funk & Associates. Intuit Dome is slated to open for the 2024-2025 NBA season.

Intuit Dome at half court

Intuit Dome outdoor plaza

Intuit Dome interior practice court

Related Stories

| Sep 16, 2011

Largest solar installation completed at Redskins' football stadium

On game days, solar power can provide up to 20% of FedExField’s power.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

| Aug 11, 2010

Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms

A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

PCL Construction, HITT Contracting among nation's largest commercial building contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Commercial Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

TCF Bank Stadium first new football stadium to get LEED certification

The University of Minnesota has received LEED Silver certification for its 50,805-seat TCF Bank Stadium, making it the first new football stadium in the country to achieve LEED status. Designed by Populous, Kansas City, Mo., the facility features a stormwater management system that captures and stores rainwater in an underground filtering system, where it is harvested, filtered, and drained int...

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021