KTGY Architecture and Planning has unveiled the designs for the Main Street mixed-use portion of Downtown Superior. The project will create a walkable 12-acre mixed-use location incorporating residential, commercial, civic, retail, and restaurants.
The mixed-use community has been inspired by the area’s coal mining history and uses a blend of materials including brick and black metal. The designs for the 10 residential, four commercial, and four mixed-use buildings will help establish a sense of place along the new Main Street between Marshall Road and Superior Drive. In total, the buildings will comprise 382 residential units and over 70,000 sf of commercial, retail, and restaurant space.
On the north side of Main Street, a five-story apartment building with structured parking sits adjacent to retail spaces. “The large ‘wrap’ building, which features 76 residential units and commercial retail, will be topped by a 5th story resident clubhouse and pool deck which will have panoramic views of the Flat Irons and the entire Front Range,” said Terry Willis, AIA, LEED AP, KTGY Principal in a release. “The above-grade parking garage in the wrap building provides ultimate convenience both for residents and patrons of the civic functions, retail and restaurants.”
See Also: Building sensors: A digital crystal ball
A landscaped paseo runs as a central spine between the apartment building and the park-front restaurant, ending on the northern end of the paseo and connecting residential units to the retail plaza. The central plaza will serve as the public town square and open to Main Street, engaging the first-floor commercial uses along its sides. The central plaza is designed to host concerts, markets, and community events.
A stand-alone retail building will anchor the plaza at the corner of Superior and Main Street. On the south side of Main Street, two stories of residential sit atop a first-floor commercial space.
Construction will begin in the second quarter of 2020 with the first phase of apartments and retail slated for completion by the end of the summer in 2021. The final phase is anticipated to complete in the second half of 2022.
The overall development plans for Downtown Superior include public sports fields as part of a new 46-acre public park system, offices, hotels, entertainment, civic additional residential, and medical facilities.
Related Stories
| Aug 11, 2010
Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report
A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Portland Cement Association offers blast resistant design guide for reinforced concrete structures
Developed for designers and engineers, "Blast Resistant Design Guide for Reinforced Concrete Structures" provides a practical treatment of the design of cast-in-place reinforced concrete structures to resist the effects of blast loads. It explains the principles of blast-resistant design, and how to determine the kind and degree of resistance a structure needs as well as how to specify the required materials and details.
| Aug 11, 2010
New website highlights government tax incentives for large commercial buildings
Energy Retrofit Group (ERG), the subsidiary of 40-year-old, award-winning Adache Group Architects, Inc., has announced the creation of their new energy conservation web site: www.energy-rg.com.
| Aug 11, 2010
Gensler, HOK, HDR among the nation's leading reconstruction design firms, according to BD+C's Giants 300 report
A ranking of the Top 100 Reconstruction Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
The Joule Hotel
Dallas, Texas
The Joule Hotel in Dallas, designed by local firm Coburn & Smith, was constructed in 1927 as the Dallas National Bank Building. Originally one of the finest examples of gothic revival architecture in Texas, it had had most of its gothic elements removed over the years after being converted into an office building and later abandoned. What was left had fallen into disrepair.
| Aug 11, 2010
AECOM, WATG top BD+C's ranking of the nation's 75 largest hotel design firms
A ranking of the Top 75 Hotel Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
ASHRAE introduces building energy label prototype
Most of us know the fuel efficiency of our cars, but what about our buildings? ASHRAE is working to change that, moving one step closer today to introducing its building energy labeling program with release of a prototype label at its 2009 Annual Conference in Louisville, Ky.
| Aug 11, 2010
Urban Land Institute honors five 'outstanding' developments in Europe, Middle East, and Africa
Five outstanding developments have been selected as winners of the Urban Land Institute (ULI) 2009 Awards for Excellence: Europe, Middle East, and Africa (EMEA) competition. This year, the competition also included the announcement of two special award winners. The Awards for Excellence competition is widely regarded as the land use industry’s most prestigious recognition program.
| Aug 11, 2010
Cannon Design’s European-inspired Sparkling Hill Resort breaks ground
Cannon Design, a leading international architectural, engineering and planning firm, is pleased to announce that the firm’s Sparkling Hill Resort and Wellness Hotel in Vernon, BC, has broken ground.