flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Kraft Heinz meat processing and packaging facility occupies 70 acre plot in Davenport, Iowa

Industrial Facilities

Kraft Heinz meat processing and packaging facility occupies 70 acre plot in Davenport, Iowa

The facility is the first Greenfield construction project for the Kraft Heinz Company since the merging of Kraft Foods Group and H.J. Heinz Company in 2015.


By David Malone, Associate Editor | January 10, 2018
The Kraft heinz Davenport facility

Courtesy Gray Construction

Designed and built by Gray Construction, Kraft Heinz’s new 382,157-sf meat processing and packaging facility in Davenport, Iowa occupies a 70-acre site in the Eastern Iowa Industrial Center.

The building’s floor construction consists of structural slabs while the wall construction consists of insulated metal panels. The structure is conventional steel. The facility includes a 305,346-sf food processing area, a 34,342-sf utility area, and a 42,469-sf office area.

The highly automated plant went from foundation to first production in 14 months. Full occupancy was not achieved until 20 months due to Kraft Heinz increasing the scope of the project to include process installation and a building expansion. The facility now produces hundreds of millions of pounds of deli meats per year.

Gray Construction provided the architecture, civil engineering, structural engineering, electrical engineering, mechanical engineering, and construction management for the project.

Food Engineering magazine recently honored the Kraft Heinz Davenport facility as the 2018 Food Plant of the Year.

Related Stories

| Apr 29, 2014

Best of Canada: 12 projects nab nation's top architectural prize [slideshow]

The conversion of a Mies van der Rohe-designed gas station and North Vancouver City Hall are among the recently completed projects to win the 2014 Governor General's Medal in Architecture. 

| Apr 29, 2014

USGBC launches real-time green building data dashboard

The online data visualization resource highlights green building data for each state and Washington, D.C.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Apr 2, 2014

Check out the stunning research facility just named 2014 Lab of the Year [slideshow]

NREL's Energy Systems Integration Facility takes top honors in R&D Magazine's 48th annual lab design awards. 

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 26, 2014

First look: Lockheed Martin opens Advanced Materials and Thermal Sciences Center in Palo Alto

The facility will host advanced R&D in emerging technology areas like 3D printing, energetics, thermal sciences, and nanotechnology.

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 20, 2014

Fluor defines the future 7D deliverable without losing sight of real results today

A fascinating client story by Fluor SVP Robert Prieto reminds us that sometimes it’s the simplest details that can bring about real results today—and we shouldn’t overlook them, even as we push to change the future state of project facilitation. 

| Mar 19, 2014

Frames: the biggest value engineering tip

In every aspect of a metal building, you can tweak the cost by adjusting the finish, panel thickness, and panel profile. These changes might make a few percentage points difference in the cost. Change the framing and you have the opportunity to affect 10-20 percent savings to the metal building portion of the project.

boombox1
boombox2
native1

More In Category

Industrial Facilities

8 ways to cool a factory

Whichever way you look at it—from a workplace wellness point of view or from a competing for talent angle—there are good reasons to explore options for climate control in the factory workplace.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021