flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KPF designs three-building San Jose office campus

Office Buildings

KPF designs three-building San Jose office campus

The project will be adjacent to Google's planned eight million square foot transit village and Diridon Station.


By David Malone, Associate Editor | May 15, 2020
Platform 16 exterior aerial

Courtesy Plompmozes for KPF.

Platform 16, a 1,200,000-sf, three-building office campus, has recently broken ground in Downtown San Jose. The Kohn Pedersen Fox-designed project will be located on a 5.4-acre site adjacent to Google's planned transit village and Diridon Station, a major Bay Area transportation hub.

Platform 16 will include a main facade with three module orientations (center, left, and right) to create a sense of depth and texture by breaking down the building's scale and creating a shimmering effect in the sun's reflection. The low, horizontal mass recedes from the street as it steps up to create large terraces at every level. These terraces will provide significant outdoor space for tenants, while also bringing daylight deep into Platform 16's interiors. The bronze terrace facade will contrast with the main wall in materiality and scale.

 

Platform 16 facade and exterior spaceCourtesy Plompmozes for KPF.

 

The project's combination of a high-performance facade, passive cooling systems, high efficiency lighting systems, and a solar PV roof covering 20% of the building have the building projected to outperform the AIA 2030 Commitment goal of 80% reduction against its baseline.

 

See Also: A resort with a giant artificial wave basin is being planned for southern California

 

Platform 16 will also provide immediate pedestrian access to the neighborhood and transit access to the Bay Area at large. On its south side, San Pedro Square will become a flexible public realm with access to the city's financial center, the SAP Center, and Diridon Station.

 

Platform 16 exterior courtyard between buildingsCourtesy Plompmozes for KPF.

 

Other project features include various active pedestrian plazas, expansive floorplates, and 15-foot floor-to-floor heights. 

The first phase of construction is slated for completion in 2023.

 

Platform 16 as viewed from across the streetCourtesy KPF.

 

Platform 16 outdoor terrace spaceCourtesy Byencore for KPF.

 

PLatform 16 interior spaceCourtesy Byencore for KPF.

 

Platform 16 interiorCourtesy Byencore for KPF.

 

Platform 16 interior office spaceCourtesy Byencore for KPF.

 

Platform 16 indoor/outdoor spaceCourtesy Byencore for KPF.

 

Platform 16 exterior at nightCourtesy Plompmozes for KPF.

Related Stories

Office Buildings | Apr 10, 2017

Innovation lab makes developing eye care solutions a collaborative affair

The Shop East innovation lab presents 13,500 sf of workspace across two floors with an emphasis on collaboration. 

Mixed-Use | Apr 7, 2017

North Hollywood mixed-use development NoHo West begins construction

The development is expected to open in 2018.

High-rise Construction | Apr 4, 2017

Fifth tallest tower in the world opens in Seoul with the world’s highest glass-bottomed observation deck

Lotte World Tower’s glass-bottomed observation deck allows visitors to stand 1,640 feet above ground and look straight down.

Office Buildings | Apr 4, 2017

Amazon’s newest office building will be an ‘urban treehouse’

The building will provide 405,000 sf of office space in downtown Seattle.

Standards | Mar 29, 2017

Wellness movement is catching on with AEC firms

Hord Caplan Macht the latest to join the club by submitting its offices for certification under Fitwel’s program.

BIM and Information Technology | Mar 28, 2017

Digital tools accelerated the design and renovation of one contractor’s new office building

One shortcut: sending shop drawings created from laser scans directly to a wood panel fabricator.

Office Buildings | Mar 27, 2017

New York warehouse to become an office mixing industrial and modern aesthetics

The building is located in West Chelsea between the High Line and West Street.

Office Buildings | Mar 24, 2017

Brookfield expands its ‘office of the future’ brand to Houston

The developer engaged four design firms to come up with unique suites it will market under its DesignHive label. 

Office Buildings | Mar 21, 2017

Fruit company’s HQ acts as an oasis among surrounding industrial processing yards

Graham Baba Architects designed the project around a central, landscaped courtyard.

Office Buildings | Mar 20, 2017

The new workplace: More than a generational issue

Today’s workplace requires designers and employers to look holistically at the organization’s culture, its criteria for success, and its place in the world.

boombox1
boombox2
native1

More In Category

Office Buildings

Unlocking Sustainability: Smart Access in the Coworking Space

Smart building technologies, including modern access control systems, are transforming coworking spaces by advancing sustainability initiatives and offering new ways to create and operate efficient working spaces. Learn more about the benefits of eco-friendly practices, from reducing carbon emissions to cutting operating costs, and discover 
how choosing the right partners can amplify your green efforts.


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021