The Wilshire Grand tower, a new mixed-use project in Los Angeles' financial district, will be the tallest U.S. building west of Chicago, at 1,100 feet. AC Martin Partners designed the $1 billion tower, which will combine retail, office, and hotel space.
Developer Korean Air worked closely with the design team on the 71-story project, comprising retail and restaurant space at the street level, 100,000 sf of offices in the mid-section, and a luxury 900-room hotel at the top. Features include a concrete-reinforced hardened elevator shaft design, intended to preserve elevator functionality for four hours during a fire evactuation. The top of the building will be accented with a glass pediment and spire, and the glass façade will incorporate embedded LED lighting.
The tower is being built on the site of the prior Wilshire Grand hotel and office building, which closed in 2011.
(http://www.ladowntownnews.com/news/new-wilshire-grand-design-revealed/article_a1871f80-717d-11e2-aae7-001a4bcf887a.html)acn
Related Stories
| Feb 28, 2012
Waste Management awards companies for sustainable construction
This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite.
| Feb 28, 2012
More than 1,000 have earned EDAC certification since 2009
Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.
| Feb 28, 2012
McCarthy completes second phase of San Diego’s Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.
| Feb 28, 2012
LUMEnergi names Weinbaum president and CEO
Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.
| Feb 27, 2012
Consigli complete first building for Bigelow Ocean Sciences Campus
Designed by WBRC Architects Engineers in association with Perkins + Will.
| Feb 27, 2012
Hollister completes fit-out of 41,500-sf office space in Princeton, N.J.
Intricate interior project involved construction of more than 80 offices.
| Feb 27, 2012
Research Institute at Texas Children’s Hospital building receives LEED Gold
Innovative and sustainable design reflects best environmental building practices.