flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KLMK Group awarded contract with Parkland Health & Hospital System in Texas

KLMK Group awarded contract with Parkland Health & Hospital System in Texas

KLMK will also provide planning guidance in all aspects of the project related to facility activation.


By Posted by Tim Gregorski, Senior Editor | June 6, 2012
This article first appeared in the July 2012 issue of BD+C.

KLMK Group, Inc. has been awarded the contract for Phase I of Hospital Move Planning Services for the 2.5 million sf, 862-bed Parkland facility that has a total project budget of $1.3 billion.

Phase I of the project will begin with KLMK leading a Readiness Assessment. This will allow the team to identify the needs of leaders within the hospital so they fully understand the move sequences and probable scenarios during the transition. KLMK will also provide planning guidance in all aspects of the project related to facility activation, including but not limited to: Equipment Procurement, IT, Move Activation, Equipment Testing and Staff and Patient Training. KLMK will be responsible for the development of the relocation team structure, master plan, budget and a Launch Gap Analysis during the planning phase. The target completion for Phase 1 is July 31, 2012.

Transition into the new Parkland hospital will begin in winter 2013 and the hospital is estimated to open in spring 2014. +

Related Stories

| Oct 5, 2011

GREENBUILD 2011: Brick offers growing options for sustainable building design

Brick exteriors, interiors and landscaping options can increase sustainability that also helps earn LEED certification.

| Oct 5, 2011

GREENBUILD 2011: Roof hatch designed for energy efficiency

The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with the curb to reduce air permeability and ensure energy performance. 

| Oct 4, 2011

GREENBUILD 2011

Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.

| Oct 4, 2011

GREENBUILD 2011: Methods, impacts, and opportunities in the concrete building life cycle

Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub conducted a life-cycle assessment (LCA) study to evaluate and improve the environmental impact and study how the “dual use” aspect of concrete.

| Oct 4, 2011

GREENBUILD 2011: Johnsonite features sustainable products

Products include rubber flooring tiles, treads, wall bases, and more. 

| Oct 4, 2011

GREENBUILD 2011: Nearly seamless highly insulated glass curtain-wall system introduced

Low insulation value reflects value of entire curtain-wall system. 

| Oct 4, 2011

GREENBUILD 2011: Ready-to-use wood primer unveiled

Maintains strong UV protection, clarity even with application of lighter, natural wood tones.

| Oct 4, 2011

GREENBUILD 2011: Two new recycled glass products announced

The two collections offer both larger and smaller particulates. 

| Oct 4, 2011

GREENBUILD 2011: Mythic Paint launches two new paint products

A high performance paint, and a combination paint and primer now available. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021