flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KLH Engineers flaunts its innovation with latest spinoff

Engineers

KLH Engineers flaunts its innovation with latest spinoff

Configure platform brings suppliers, designers, and contractors closer during the purchasing process.


By John Caulfield, Senior Editor | June 2, 2022
Configure is the latest spinoff from KLH Engineers
Configure is the latest spinoff from KLH Engineers. It is a platform that makes specifying smoother by linking AEC firms with manufacturers. Leaders from Configure and KLH Engineers (from left): Jeff Leuderalbert and Michael Albanese, cofounders of Configure, with Jim Tavernelli and Bob Heil, KLH Engineers’ President and CEO. Image: KLH Engineers

About 15 months ago, KLH Engineers, a national MEP and technology engineering firm based in Kentucky, spun off Levcon Analytics, which uses data to provide AEC firms with design, construction, and operations advice. By uniting design and building teams, Levcon’s Convergit data integration platform also improves a building owner’s asset management and project execution.

Late last month, KLH spun off another entity. Known as Configure, the now-separate business has been developing a construction marketplace that digitizes supply and makes it easier for designers and contractors to specify, compare, and purchase engineered-to-order products from manufacturers. Configure’s platform is accessible through web apps or Autodesk Revit plug-ins.

PRICING PRODUCTS, MADE SIMPLER

Its conception was born out of the frustration of trying to specify equipment with pricing information being immediately at hand, explains Michael Albanese, a principal with KLH Engineers who, with principal Jeff Leuderalbert, came up with Configure and developed its platform.

Leuderalbert elaborates that during a project’s design phase, suppliers communicate with potential customers within their Revit models, and designers can link products, product data and pricing directly into their models. During pre-construction, Configure matches contractors with local suppliers so they can solicit and compare bids in one platform, and select the package that best fits their project and budget.

Some of Configure’s early customers include Tweet/Garot Mechanical, Green Bay, Wis.; Silicon Valley Mechanical, San Jose, Calif.; and Peck Hannaford + Briggs, Cincinnati, Ohio. 

SUPPORTERS FROM INSIDE AND OUT

During Configure’s early development, KLH allowed Albanese and Leuderalbert to leverage the firm’s in-house software team to build their platform. Configure has raised $2 million in a seed round led by TitletownTech, a Wisconsin-based venture capital fund formed out of a partnership between the Green Bay Packers and Microsoft. Configure will deploy its new capital to expand its software technology and make additional product development hires.

These spinoffs demonstrate KLH’s innovation beyond engineering consultation, says Tavernelli, who implies there might be more to come. “We learned so much throughout this journey and KLH will leverage that experience to continue seeking ways to create new value in the industry.”

Tags

Related Stories

Sports and Recreational Facilities | Mar 14, 2024

First-of-its-kind sports and rehabilitation clinic combines training gym and healing spa

Parker Performance Institute in Frisco, Texas, is billed as a first-of-its-kind sports and rehabilitation clinic where students, specialized clinicians, and chiropractic professionals apply neuroscience to physical rehabilitation. 

Market Data | Mar 14, 2024

Download BD+C's March 2024 Market Intelligence Report

U.S. construction spending on buildings-related work rose 1.4% in January, but project teams continue to face headwinds related to inflation, interest rates, and supply chain issues, according to Building Design+Construction's March 2024 Market Intelligence Report (free PDF download). 

Apartments | Mar 13, 2024

A landscaped canyon runs through this luxury apartment development in Denver

Set to open in April, One River North is a 16-story, 187-unit luxury apartment building with private, open-air terraces located in Denver’s RiNo arts district. Biophilic design plays a central role throughout the building, allowing residents to connect with nature and providing a distinctive living experience.

Affordable Housing | Mar 12, 2024

An all-electric affordable housing project in Southern California offers 48 apartments plus community spaces

In Santa Monica, Calif., Brunson Terrace is an all-electric, 100% affordable housing project that’s over eight times more energy efficient than similar buildings, according to architect Brooks + Scarpa. Located across the street from Santa Monica College, the net zero building has been certified LEED Platinum.

Museums | Mar 11, 2024

Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion

In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.

Affordable Housing | Mar 11, 2024

Los Angeles’s streamlined approval policies leading to boom in affordable housing plans

Since December 2022, Los Angeles’s planning department has received plans for more than 13,770 affordable units. The number of units put in the approval pipeline in roughly one year is just below the total number of affordable units approved in Los Angeles in 2020, 2021, and 2022 combined.

BIM and Information Technology | Mar 11, 2024

BIM at LOD400: Why Level of Development 400 matters for design and virtual construction

As construction projects grow more complex, producing a building information model at Level of Development 400 (LOD400) can accelerate schedules, increase savings, and reduce risk, writes Stephen E. Blumenbaum, PE, SE, Walter P Moore's Director of Construction Engineering.

AEC Tech | Mar 9, 2024

9 steps for implementing digital transformation in your AEC business

Regardless of a businesses size and type, digital solutions like workflow automation software, AI-based analytics, and integrations can significantly enhance efficiency, productivity, and competitiveness.

Sports and Recreational Facilities | Mar 7, 2024

Bjarke Ingels’ design for the Oakland A’s new Las Vegas ballpark resembles ‘a spherical armadillo’

Designed by Bjarke Ingels Group (BIG) in collaboration with HNTB, the new ballpark for the Oakland Athletics Major League Baseball team will be located on the Las Vegas Strip and offer panoramic views of the city skyline. The 33,000-capacity covered, climate-controlled stadium will sit on nine acres on Las Vegas Boulevard. 

Adaptive Reuse | Mar 7, 2024

3 key considerations when converting a warehouse to a laboratory

Does your warehouse facility fit the profile for a successful laboratory conversion that can demand higher rents and lower vacancy rates? Here are three important considerations to factor before proceeding. 

boombox1
boombox2
native1

More In Category


Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021