flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KJWW Engineering Consultants acquires Michigan-based facilities engineering services firm

Engineers

KJWW Engineering Consultants acquires Michigan-based facilities engineering services firm

FES Group is particularly strong in the automotive industry.


By John Caulfield, Senior Editor | May 11, 2016

The KJWW Engineering Consultants division of IMEG Corp. has expanded its footprint in the state of Michigan by merging with FES Group, a facility engineering services and architectural firm based in Wixom, Mich., with 25 employees.

KJWW, based in Quad-Cities, Ill., was already one of the country’s largest engineering firms specializing in high-performance building systems, infrastructure, and construction-related services.

The acquisition comes seven months after KJWW and TTG Engineers merged and formed IMEG Corp., a holding company that owns both engineering firms, headquartered in the Quad-Cities. The two U.S.-based firms operate independently and have retained their original names. Together, they have a global footprint of nearly 1,000 employees. With the addition of FES Group, IMEG will have 26 national offices as well as six international locations, according to the Quad City Times.

The merger was finalized on May 1. Its terms were not disclosed.

FES’s services include Structural, Mechanical, and Electrical Engineering, Architectural Engineering, and BIM modeling. Its website says that FES operates a branch office in Auburn Hills, Mich., suburb of Detroit. Its primary markets include commercial, healthcare, R&D, and industrial. 

Paul VanDuyne, KJWW’s President, stated that the merger with FES Group gives his company a stronger presence in Michigan. He lauded FES’s technical prowess, attention to high-quality design, and client-centric focus. “FES Group’s strength in the automotive industry brings added value to KJWW’s extensive industrial and process portfolio and expertise.”

FES Group, which was formed in 2002, will operate as FES/KJWW, at least for now, and the Wixom office will remain open. Joe Droze, FES Group’s President, is staying on to run that office as a principal with KJWW. In a statement, Droze said he was impressed with KJWW’s reputation, national recognition for sustainable design, and education/training programs.

On the sustainable front, KJWW has engineered more than 150 LEED-certified projects in a wide range of sectors including aviation, corrections, education, entertaining, mission critical, science and technology, and sports and recreation.

Aside from its offices across the U.S., KJWW has locations in Dubai, India, and Lebanon.

Tags

Related Stories

| Apr 24, 2012

McLennan named Ashoka Fellow

McLennan was recognized for his work on the Living Building Challenge.

| Apr 24, 2012

AECOM design and engineering team realizes NASA vision for Sustainability Base

LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.

| Apr 23, 2012

Vegas’ CityCenter called financial ‘black hole’

Two and a half years ago, stockholders filed six lawsuits after the stock price fell from $99.75 on Oct. 9, 2007, to $1.89 on March 5, 2009. Bondholders sued over similar steep losses.

| Apr 23, 2012

Innovative engineering behind BIG’s Vancouver Tower

Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.

| Apr 23, 2012

AAMA releases updated specification for anodized aluminum

AAMA 611-12 describes test procedures and requirements for high performance (Class I) and commercial (Class II) architectural quality aluminum oxide coatings applied to aluminum extrusions and panels for architectural products.

| Apr 23, 2012

Thornton Tomasetti project wins AISC Merit Award

Thornton Tomasetti provided structural design services through construction administration to architect HOK for the 1.6-million-sf tower and tiara structure, which comprises 15 steel tube arches spanning approximately 158 feet horizontally and 130 feet vertically from the top of the main building roof.

| Apr 23, 2012

Construction underway on City Winery Chicago

The Building Team is maintaining the old brick and timber construction, while adding 5,000-sf of new construction in the form of a two-story addition within the site’s existing courtyard.

| Apr 20, 2012

McCarthy completes Santa Barbara Cottage Hospital Replacement Facility

The new hospital’s architectural design combines traditional Santa Barbara Spanish colonial architecture with 21st century medical conveniences highlighted by a therapeutic and sustainable atmosphere.

| Apr 20, 2012

Century-old courthouse renovated for Delaware law firm offices

To account for future expansion, Francis Cauffman developed a plan to accommodate the addition of an 8-story tower to the building.

| Apr 20, 2012

RCMA and Oak Ridge National Laboratory to host International Roof Coatings Conference

The International Roof Coatings Conference will feature keynote speakers Marc LaFrance of the U.S. Department of Energy, and Art Rosenfeld of the Lawrence Berkeley National Laboratory.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021