flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KBE Building wins honor for Armed Forces Reserve Center

KBE Building wins honor for Armed Forces Reserve Center

The construction phase was completed in just 16 months.


By Posted by Tim Gregorski, Senior Editor | June 27, 2012
The $54 million, 203,000-sf AFRC facility in Middletown, Conn.
The $54 million, 203,000-sf AFRC facility in Middletown, Conn.

KBE Building Corporation (KBE) (www.kbebuilding.com) earned a First Place Award for the Armed Forces Reserve Center (AFRC) at the 2012 Connecticut Building Congress (CBC) 16th Annual Project Team Awards Banquet in the category of Best New Project over $10 million.

The $54 million, 203,000-sf AFRC facility in Middletown, Connecticut encompasses a state-of-the-art training center, a vehicle maintenance facility, and a field equipment storage facility for the Connecticut National Guard and Army Reserve. KBE Building Corporation was the Design-Builder for the project in a joint venture with DeRita Construction Company, with Kleinfelder as the Architect of Record. The construction phase was completed in just 16 months, a remarkable achievement given the scope of work, which included the removal of nearly 500,000 cubic yards of soil and rock from the site. The new Reserve Center features numerous “green” building measures, including a “green” roof, photovoltaic arrays, and high-efficiency heating and cooling systems.

Previously, the Armed Forces Reserve Center project won Best in Show from Connecticut’s Associated Builders and Contractors, Inc., as well as the 2012 Engineering Excellence Grand Award from the American Council of Engineering Companies. +

Related Stories

| Mar 7, 2012

Turner appointed Batson-Cook CFO and treasurer

Cecil G. Hood to continue in advisory role.

| Mar 7, 2012

Thornton Tomasetti names Dowdall VP of Kansas City office

Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.

| Mar 7, 2012

LEO A DALY selected to design Minnesota Fallen Firefighters Memorial

The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.

| Mar 7, 2012

Houlihan Lokey adds Steffen to Industrials Group

Steffen bolsters group with experience in the building materials and rorest product sectors.

| Mar 6, 2012

Country’s first Green House home for veterans completed

Residences at VA Danville to provide community-centered housing for military veterans.

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

| Mar 6, 2012

Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago

Construction was completed by Skender in just 12 weeks.

| Mar 6, 2012

BLT Architects promotes two to associate

Architect Nicole Dress and interior designer Jessica Moser acknowledged for excellence.

| Mar 6, 2012

Joliet Junior College achieves LEED Gold

With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.

| Mar 5, 2012

Tishman constructing new courthouse in Philadelphia

Construction is underway for the Pennsylvania Department of General Services’ 510,000-sf facility.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021