KBE Building Corporation (KBE) (www.kbebuilding.com) earned a First Place Award for the Armed Forces Reserve Center (AFRC) at the 2012 Connecticut Building Congress (CBC) 16th Annual Project Team Awards Banquet in the category of Best New Project over $10 million.
The $54 million, 203,000-sf AFRC facility in Middletown, Connecticut encompasses a state-of-the-art training center, a vehicle maintenance facility, and a field equipment storage facility for the Connecticut National Guard and Army Reserve. KBE Building Corporation was the Design-Builder for the project in a joint venture with DeRita Construction Company, with Kleinfelder as the Architect of Record. The construction phase was completed in just 16 months, a remarkable achievement given the scope of work, which included the removal of nearly 500,000 cubic yards of soil and rock from the site. The new Reserve Center features numerous “green” building measures, including a “green” roof, photovoltaic arrays, and high-efficiency heating and cooling systems.
Previously, the Armed Forces Reserve Center project won Best in Show from Connecticut’s Associated Builders and Contractors, Inc., as well as the 2012 Engineering Excellence Grand Award from the American Council of Engineering Companies. +
Related Stories
| Mar 21, 2014
Pier Carlo Bontempi to receive Richard H. Driehaus Prize from Notre Dame
Established in 2003 by the Notre Dame School of Architecture, the $200,000 Richard H. Driehaus Prize is awarded to a living architect whose work embodies the highest ideals of traditional and classical architecture in contemporary society, and creates a positive cultural, environmental and artistic impact.
| Mar 21, 2014
How to get more referrals
If you’re having a hard time attracting new referrals, here are a few techniques for increasing the number of interactions with potential clients.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.
| Mar 20, 2014
D.C. breaks ground on $2B mega waterfront development [slideshow]
When complete, the Wharf will feature approximately 3 million sf of new residential, office, hotel, retail, cultural, and public uses, including waterfront parks, promenades, piers, and docks.
| Mar 20, 2014
13 dazzling wood building designs [slideshow]
From bold structural glulam designs to striking textured wall and ceiling schemes, these award-winning building projects showcase the design possibilities using wood.
| Mar 20, 2014
Fluor defines the future 7D deliverable without losing sight of real results today
A fascinating client story by Fluor SVP Robert Prieto reminds us that sometimes it’s the simplest details that can bring about real results today—and we shouldn’t overlook them, even as we push to change the future state of project facilitation.
| Mar 19, 2014
Architecture Billings Index shows slight improvement
The American Institute of Architects (AIA) reported that the February ABI score was 50.7, up slightly from a mark of 50.4 in January.
| Mar 19, 2014
Gehry, Zaha, Foster, Meier: Vote for your top 'starchitect' in this March Madness design legends tourney
Fast Company's Bracket Madness tournament pits 32 designers against each other to see who truly is the world's greatest living designer.
| Mar 19, 2014
Is it time to start selecting your own clients?
Will 2014 be the year that design firms start selecting the clients they want rather than getting in line with competitors to respond to RFPs? That’s the question posed by a recent thought-provoking article.
| Mar 19, 2014
How to develop a healthcare capital project using a 'true north charter'
Because healthcare projects take years to implement, developing a true north charter is essential for keeping the entire team on track and moving in the right direction.