flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KBE Building renovates UConn dining hall

KBE Building renovates UConn dining hall

Construction for McMahon Dining Hall will be completed in September 2012.


By Posted by Tim Gregorski, Senior Editor | July 25, 2012
The $7.1 million project consists of 14,000-sf of renovations, including a 5,500
The $7.1 million project consists of 14,000-sf of renovations, including a 5,500-sf addition, a new dining facility with all new

KBE Building started renovations on the University of Connecticut’s McMahon Dining Hall.

The $7.1 million project consists of 14,000-sf of renovations, including a 5,500-sf addition, a new dining facility with all new kitchen equipment, and the removal of a storefront. The existing building is composed of two seven-story towers and a two-story dining & lounge area.

KBE has constructed eight projects to date for the University of Connecticut, including the 138,000-sf, 450-bed Hilltop Residence Hall, the 230,000-sf award-winning renovation and addition to the Student Union, and the renovation and code upgrades to more than 50 buildings on the main campus at Storrs and at three other satellite campuses in the state.

Construction for McMahon Dining Hall will be completed in September 2012. +

Related Stories

| Dec 10, 2011

BIM tools to make your project easier to manage

Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.

| Dec 9, 2011

BEST AEC FIRM 2011: MHTN Architects

Serving Utah for nearly eight decades.

| Dec 9, 2011

BEST AEC FIRM 2011: HMC Architects

Fostering a tradition of collaboration.

| Dec 9, 2011

BEST AEC FIRM 2011: Gensler

Developing talent on a global scale.

| Dec 9, 2011

BEST AEC FIRM 2011: Chapman Construction/Design

Taking sustainable practices to heart.

| Dec 9, 2011

BEST AEC FIRMS 2011: EYP Architecture & Engineering

Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.

| Dec 8, 2011

Keast & Hood Co. part of Statue of Liberty renovation team

Keast & Hood Co., is the structural engineer-of-record for the year-long $27.25 million renovation of the Statue of Liberty. 

| Dec 8, 2011

HDR opens office in Shanghai

The office, located in the Chong Hing Finance Center in Shanghai’s busy Huangpu District, will support HDR’s design efforts throughout Asia. 

| Dec 8, 2011

HOK elevates the green office standard

Firm achieves LEED Platinum certification in New York office that overlooks Bryant Park.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021