flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KBE Building awarded Platinum STEP Award

KBE Building awarded Platinum STEP Award

STEP program provides analysis of safety and loss prevention programs, measure safety program improvements, and provide performance recognition.


By Posted by Tim Gregorski, Senior Editor | July 17, 2012
This article first appeared in the August 2012 issue of BD+C.

KBE Building Corp. recently received the Platinum STEP (Safety Training & Evaluation Process) Award from the national Associated Builders & Contractors (ABC).

The ABC National Environment Health & Safety Committee established the STEP program in 1989 to provide an analysis of safety and loss prevention programs, measure safety program improvements, and provide performance recognition. The STEP awards are separated into five categories: Bronze, Silver, Gold, Platinum, and Diamond.

The criteria for the Platinum STEP Award include:

  • A total recordable incident rate 25% or more below the NAICS (North American Industrial Classification) code industry average
  • A maintained Experience Modification Rate (EMR) of .800
  • No OSHA cited fatalities in the previous three years
  • A meeting of the minimum 20 Key Components Score

The ABC has honored KBE with either a Platinum or Gold STEP Award every year since 2003. +

Related Stories

| Sep 3, 2013

Grand Junction, Colo., courthouse aims to be first net-zero building on National Register of Historic Places

After a two year renovation, the 95-year oldWayne S. Aspinall Federal Building and Courthouse in Grand Junction, Colo., is being evaluated for LEED Platinum status and may become the National Register of Historic Places’ first net-zero-energy building.

| Aug 30, 2013

Modular classrooms gaining strength with school boards

With budget, space needs, and speed-to-market pressures bearing down on school districts, modular classroom assemblies are often a go-to solution.

| Aug 30, 2013

Local Government Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest local government design and construction firms, as reported in the 2013 Giants 300 Report.  

| Aug 30, 2013

A new approach to post-occupancy evaluations

As a growing number of healthcare institutions become more customer-focused, post-occupancy evaluations (POE) are playing a bigger role in new construction and renovation projects. Advocate Health Care is among the healthcare organizations to institute a detailed post-occupancy assessment process for its projects. 

| Aug 30, 2013

State Government Report [2013 Giants 300 Report]

Stantec, Jacobs, PCL Construction among nation's top state government design and construction firms, according to BD+C's 2013 Giants 300 Report.

| Aug 29, 2013

Is it possible to build a LEED Gold prison?

Why yes, of course it is. Correctional design exerts from Shive-Hattery and the Iowa Department of Corrections will demonstrate how at the upcoming BUILDINGChicago conference and expo, September 9-11 at the Holiday Inn Chicago Mart Plaza.  

| Aug 29, 2013

First look: K-State's Bill Snyder Family Stadium expansion

The West Side Stadium Expansion Project at Kansas State's Bill Snyder Family Stadium is the largest project in K-State Athletics history. 

Sponsored | | Aug 29, 2013

Nichiha USA panels selected for unique mixed-use project in Cambridge, Mass.

Peter Quinn Architects specifies Nichiha’s Illumination Series Panels for a progressive look for a work/live/play development in the heart of the Harvard community.

| Aug 28, 2013

Focusing on the total client experience

Although firms commonly use client satisfaction surveys and interviews to assess how well their teams are performing, a new article from Harvard Business Review suggests these tools might not provide an accurate picture of the total client experience. 

| Aug 28, 2013

Standards for BIM improve reliability of data downstream, but what does this mean for us today?

I’m encouraged to see progress being made to make BIM more useable and reliable downstream. These are all good steps in the right direction, but how can we leverage this additional clarity today? Does it require us to have all stakeholders and team members in the model to collaborate and share information? It appears as if this is the ultimate goal.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021