KBE Building Corporation and CTA Construction have been recognized by the Construction Management Association of America, New England Chapter, with the 2012 Project of the Year Award for the renovation of Beverly High School in Beverly, Mass.
The $68 million project included a phased 113,000-sf renovation and a four-story, 147,000-sf addition. The existing 27,000-sf field house, 752-seat auditorium, kitchen, cafeteria, fitness room, and locker rooms were renovated, and the addition comprised of new classrooms, including two 1,026-sf culinary classrooms, a library, a health center, science labs, and administrative offices.
The 2012 Project of the Year Award honors projects that were completed before March 2012, and were constructed with a value more than $20 million. The Beverly High School project was completed in November of 2011.
Related Stories
| Jul 22, 2011
High-performance windows and doors
Learning objectives After reading this article, you should be able to: Understand issues of thermal performance and energy efficiency in relation to window and door systems; describe optimal detailing of the window-wall interface and how it contributes to building performance, sustainability, and occupant well-being; understand how durability contributes to sustainable windows/doors; and list sustainable O&M requirements for window and door systems.
| Jul 21, 2011
Falling Architecture Billings Index reflects decrease in design demands
This months Architecture Billings Index (ABI), provided by the American Institute of Architects, is almost a full point lower than last month’s reported score. June’s reading of 47.2 was short of the required 50 to achieve billings increases, making July’s reading of 46.3 an unwelcome sign of market tidings.
| Jun 29, 2011
New leadership role for architects in net-zero design
BD+C Editorial Director Rob Cassidy talks with RNL Design's Tom Hootman, AIA, about the changing role of architects in net-zero designs.