flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Kawneer dedicates new floodwall at its Bloomsburg facility

Kawneer dedicates new floodwall at its Bloomsburg facility

Funded by Pennsylvania H2O Grant and Alcoa, New Wall Will Protect Facility and Surrounding Area from Future Damage, Saving Resources and Offering Stability


By Kawneer | March 27, 2013

Kawneer Company, Inc., an Alcoa business and the leading manufacturer of architectural aluminum products and systems for commercial construction, dedicated a new floodwall at their Bloomsburg, Pennsylvania facility, heralding greater levels of safety and stability for employees and customers.

The floodwall, designed to protect the facility and surrounding area from potential storm damage, was funded through a partnership between the town of Bloomsburg, the Commonwealth of Pennsylvania Department of Community & Economic Development, local and state government and Alcoa. More than 280 guests, including Pennsylvania State Senator John Gordner, Pennsylvania State Representative Dave Millard, Bloomsburg Mayor Dan Knorr, Columbia County Commissioners, local business owners and Kawneer customers and employees, attended the dedication ceremony.

“Bloomsburg is an invaluable flagship location for Kawneer North America. One in every three doors you walk through in the U.S. are Kawneer doors, and, more often than not, those doors were manufactured here in Bloomsburg,” said Diana Perreiah, President, Kawneer North America and Vice President, Alcoa Building and Construction Systems, “This floodwall is the result of strong community partnerships and mutual investment. Thank you to all parties involved for helping us provide our employees a safer, more stable place to work and ensuring our customers continue to receive the Kawneer products and services they depend on.”

In September 2011, Tropical Storm Lee brought heavy rainfall and historic flooding to Pennsylvania, resulting in extensive damage to the Bloomsburg community and Kawneer’s Bloomsburg facility, which employs approximately 395 people. Kawneer and Alcoa immediately responded, developing a recovery plan and offering financial support to the community through the Alcoa Foundation. Employees worked diligently to address the challenges presented by the flood, assessing options and instituting processes to address order fulfillment while actively participating in rebuilding their community.

“It took a lot of hard work, resources and time to make this floodwall and recovery happen. I would be remiss if I didn’t thank our Bloomsburg employees and our loyal customers for their patience, diligence and commitment to one another, our company and to the Bloomsburg community which helped us build a safer and more stable facility,” said Glen Morrison, President, Alcoa Building and Construction Systems.

To learn more about Kawneer, please visit www.kawneer.com.

About Kawneer
With more than 100 years of innovation and experience, Kawneer North America is headquartered in Norcross, GA, and is the leading manufacturer of architectural aluminum products and systems for the commercial construction industry. Kawneer is a part of Alcoa’s global Building and Construction Systems (BCS) business unit. In 2010 Traco, a leading manufacturer of windows for more than 65 years, joined Alcoa BCS as a division of Kawneer. Alcoa BCS manufactures and markets architectural systems and products in North America, Europe and Asia. Alcoa is the world’s leading producer of primary and fabricated aluminum as well as the world’s largest miner of bauxite and refiner of alumina, and has been active in all major aspects of the industry for the past 125 years. For more information on Kawneer or its products, please visit www.kawneer.com.

Related Stories

| Feb 9, 2011

Kingspan Insulated Panels Announces Path to NetZero Mobile App

Kingspan Insulated Panels North America, a global manufacturer of insulated metal panels, announces the availability of its new Path to NetZero mobile app. Introduced at Greenbuild 2010, this unique tool for the building industry simulates the process of achieving high-performance and net-zero buildings.

| Jan 4, 2011

Product of the Week: Zinc cladding helps border crossing blend in with surroundings

Zinc panels provide natural-looking, durable cladding for an administrative building and toll canopies at the newly expanded Queenstown Plaza U.S.-Canada border crossing at the Niagara Gorge. Toronto’s Moriyama & Teshima Architects chose the zinc alloy panels for their ability to blend with the structures’ scenic surroundings, as well as for their low maintenance and sustainable qualities. The structures incorporate 14,000 sf of Rheinzink’s branded Angled Standing Seam and Reveal Panels in graphite gray.

| Dec 17, 2010

Gemstone-inspired design earns India’s first LEED Gold for a hotel

The Park Hotel Hyderabad in Hyderabad, India, was designed by Skidmore, Owings & Merrill to combine inspirations from the region’s jewelry-making traditions with sustainable elements.

| Dec 17, 2010

Cladding Do’s and Don’ts

A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.

| Dec 7, 2010

Product of the Week: Petersen Aluminum’s column covers used in IBM’S new offices

IBM’s new offices at Dulles Station West in Herndon, Va., utilized Petersen’s PAC-1000 F Flush Series column covers. The columns are within the office’s Mobility Area, which is designed for a mobile workforce looking for quick in-and-out work space. The majority of workspaces in the office are unassigned and intended to be used on a temporary basis.

| Nov 2, 2010

Cypress Siding Helps Nature Center Look its Part

The Trinity River Audubon Center, which sits within a 6,000-acre forest just outside Dallas, utilizes sustainable materials that help the $12.5 million nature center fit its wooded setting and put it on a path to earning LEED Gold.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

| Oct 13, 2010

New health center to focus on education and awareness

Construction is getting pumped up at the new Anschutz Health and Wellness Center at the University of Colorado, Denver. The four-story, 94,000-sf building will focus on healthy lifestyles and disease prevention.

boombox1
boombox2
native1

More In Category



Products and Materials

Top products from AIA 2024

This month, Building Design+Construction editors are bringing you the top products displayed at the 2024 AIA Conference on Architecture & Design. Nearly 550 building product manufacturers showcased their products—here are 17 that caught our eye.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021