flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Katerra launches apprenticeship program to help develop the future of construction

Contractors

Katerra launches apprenticeship program to help develop the future of construction

The program offers nationally recognized, portable construction trade credentials.


By Katerra | June 26, 2019

Courtesy Pixabay

Amid a persistent skilled labor shortage that continues to challenge the building sector, constrain housing supply and exacerbate affordability, Katerra, a technology company redefining the construction industry, today announced it has launched a new apprenticeship program that offers the necessary training and skills for the future of construction. Registered with and approved by the U.S. Department of Labor, Bureau of Apprenticeship and Training, credentials earned through the Katerra Apprenticeship Program are portable and recognized in all U.S. states and three territories.

The Katerra Apprenticeship Program offers a combination of technical classroom instruction and hands-on training for a variety of trade occupations including carpentry, plumbing, electrical and HVAC. Apprenticeships for other occupations are anticipated in the future. The educational curriculum associated with each of Katerra’s programs is accredited through the National Center for Construction Education and Research (NCCER). While individual programs vary depending on the complexity of the occupation, all Katerra apprenticeship programs require approximately 144 hours of technical instruction per year and 2,000 hours of on-the-job training. 

“Katerra is leading the construction industry in the application of new technologies and methodologies to deliver better quality buildings faster and more efficiently,” said Samantha Rist, head of self-perform at Katerra. “We developed our apprenticeship program to train the next generation of construction workers to use cutting-edge tools and the latest technology. Now, Katerra apprentices can gain portable credentials for use throughout their careers, at Katerra and beyond.”

As part of the program, Katerra offers a series of week-long boot camps at its state-of-the-art factories for related technical instruction training modules. The boot camps – delivered in both English and Spanish – are designed to ensure each participant receives individualized support. English-as-Second Language (ESL) classes are also offered.

“The lack of skilled laborers is one of the biggest challenges the building sector faces,” said NAHB Chairman Greg Ugalde, a home builder and developer from Torrington, Conn. “Apprenticeship programs like Katerra’s that offer portable credentials and teach new technologies are important as the industry seeks to broaden recruitment and increase interest in construction as a career.”

To ensure equal opportunity for training and development in the construction industry, Katerra partners with local organizations in the areas where it operates to recruit for its apprenticeship programs, including from local high schools, workforce development programs, the military, and general industry.  Interested candidates can apply for employment at Katerra’s website.

Related Stories

| Feb 29, 2012

Report says BIPV glass market to reach $6.4 billion by 2016

The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021