Katerra, the fast-growing design, prefabrication construction and technology company, today announces its acquisition of Bristlecone Construction, a four-year-old, general contractor based in Littleton, Colo., that specializes in commercial and multifamily projects whose costs range from $500,000 to $55 million.
Terms of the acquisition were not disclosed.
Bristlecone, which will become known as Katerra, is a site-built contractor that brings efficiencies to projects through self-performance, technology, and innovative procurement. “This merger allows us to expand the value and services we already provide for our clients,” says Zach Smith, the contractor’s CEO.
Bristlecone, which currently employs 150 people, expects to double its size as a result of joining forces with Katerra, according to the Denver Business Journal.
Through this acquisition, Katerra expects to gain self-perform expertise in structural concrete and framing, and extend its construction reach in the central U.S.
The purchase of Bristlecone is the latest in Katerra’s efforts to fully integrate design, manufacturing, and construction delivery services. The company, which since its founding in 2015 has built a global team of 3,500 people, is in the process of opening several new plants in the U.S. that include a 250,000-sf facility on 29 acres near Spokane, Wash., for mass timber production.
Katerra, based in Menlo Park, Calif., has amassed $1 billion in investment capital, and is valued at more than $3 billion.
Related Stories
| Feb 7, 2012
Thornton Tomasetti opens new office in Denver
The firm, which now has 25 offices internationally, opened the new office to better serve current and potential clients in the western Central region and Mountain States.
| Feb 6, 2012
Slight increase in nonres construction spending expected in 2012, growth projected for 2013
Commercial sector expected to lead real estate recovery.
| Feb 6, 2012
FMI releases 2012 Construction Productivity Report
Downsizing has resulted in retaining the most experienced and best-trained personnel who are the most capable of working more efficiently and harder.
| Feb 6, 2012
Kirchhoff-Consigli begins Phase 2 renovations at FDR Presidential Library and Museum
EYP Architecture & Engineering is architect for the $35 million National Archives Administration project.
| Feb 6, 2012
Batson-Cook announces the appointment of Hall as president
Hall will manage and direct all aspects of the firm’s day-to-day operations. He will be based in Batson-Cook’s Atlanta office.
| Feb 6, 2012
Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation
Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.
| Feb 2, 2012
Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012
Winning projects will be featured in the May issue of BD+C.
| Feb 2, 2012
VLK Architects selected for new Cypress, Texas elementary school
The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.
| Feb 2, 2012
Mortenson Construction to build 2.4 MW solar project in North Carolina
Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.