Katerra, the fast-growing design, prefabrication construction and technology company, today announces its acquisition of Bristlecone Construction, a four-year-old, general contractor based in Littleton, Colo., that specializes in commercial and multifamily projects whose costs range from $500,000 to $55 million.
Terms of the acquisition were not disclosed.
Bristlecone, which will become known as Katerra, is a site-built contractor that brings efficiencies to projects through self-performance, technology, and innovative procurement. “This merger allows us to expand the value and services we already provide for our clients,” says Zach Smith, the contractor’s CEO.
Bristlecone, which currently employs 150 people, expects to double its size as a result of joining forces with Katerra, according to the Denver Business Journal.
Through this acquisition, Katerra expects to gain self-perform expertise in structural concrete and framing, and extend its construction reach in the central U.S.
The purchase of Bristlecone is the latest in Katerra’s efforts to fully integrate design, manufacturing, and construction delivery services. The company, which since its founding in 2015 has built a global team of 3,500 people, is in the process of opening several new plants in the U.S. that include a 250,000-sf facility on 29 acres near Spokane, Wash., for mass timber production.
Katerra, based in Menlo Park, Calif., has amassed $1 billion in investment capital, and is valued at more than $3 billion.
Related Stories
| Oct 1, 2012
Tyco completes separation process, now largest pure-play fire protection and security business
Tyco Integrated Security focused on delivering security solutions to commercial businesses.
| Sep 28, 2012
Seattle is home to first LEED-certified modular radiation center
By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.
| Sep 26, 2012
EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue
Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.
| Sep 24, 2012
Reed Construction completes Lafarge headquarters in Chicago
Reed Construction was contracted to complete the full third floor build-out which included the construction of new open area work space, private offices, four conference rooms with videoconferencing capabilities and an executive conference boardroom.
| Sep 24, 2012
Chicago Lakeside shortlisted for the Sustainia Award
The “Lakeside Idea” is about bridging a brownfield industrial past to a green lifestyle future, from steel mill to innovation mill.
| Sep 24, 2012
$3.8-million athletic field and track opens in Glen Head, N.Y.
The complex also includes a new, one-story, multi-purpose building that serves as the main entry port to the athletic facilities.
| Sep 21, 2012
AAMA and WDMA release updated review and forecast that predicts industry trends
Significant volume is expected to return to the entry and interior door market as new construction demand is expected to grow at double-digit rates, outpacing remodeling and replacement activity as the housing market recovers.
| Sep 20, 2012
Mid-box retail study shows lack of available sites in Chicago
Existing supply is tight everywhere and almost non-existent in the most attractive zones.
| Sep 20, 2012
Forrester begins construction of freestanding cancer center in Montgomery County, Md.
The new 51,000-square-foot building will include two linear accelerator vaults for radiation equipment.
| Sep 19, 2012
Modular, LEED-Gold Certified Dormitory Accommodates Appalachian State University Growth
By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with traditional construction.