Katerra, the fast-growing design, prefabrication construction and technology company, today announces its acquisition of Bristlecone Construction, a four-year-old, general contractor based in Littleton, Colo., that specializes in commercial and multifamily projects whose costs range from $500,000 to $55 million.
Terms of the acquisition were not disclosed.
Bristlecone, which will become known as Katerra, is a site-built contractor that brings efficiencies to projects through self-performance, technology, and innovative procurement. “This merger allows us to expand the value and services we already provide for our clients,” says Zach Smith, the contractor’s CEO.
Bristlecone, which currently employs 150 people, expects to double its size as a result of joining forces with Katerra, according to the Denver Business Journal.
Through this acquisition, Katerra expects to gain self-perform expertise in structural concrete and framing, and extend its construction reach in the central U.S.
The purchase of Bristlecone is the latest in Katerra’s efforts to fully integrate design, manufacturing, and construction delivery services. The company, which since its founding in 2015 has built a global team of 3,500 people, is in the process of opening several new plants in the U.S. that include a 250,000-sf facility on 29 acres near Spokane, Wash., for mass timber production.
Katerra, based in Menlo Park, Calif., has amassed $1 billion in investment capital, and is valued at more than $3 billion.
Related Stories
| Jan 20, 2015
Daring hotel design scheme takes the shape of cut amethyst stone
The Dutch practice NL Architects designed a proposal for a chain of hotels shaped like a rock cut in half to reveal a gemstone inside.
| Jan 20, 2015
Avery Associates unveils plans for London's second-tallest tower
The 270-meter tower, dubbed the No. 1 Undershaft, will stand next to the city's "Cheesegrater" building.
| Jan 19, 2015
HAO unveils designs for a 3D movie museum in China
New York-based HAO has released designs for the proposed Bolong 3D Movie Museum & Mediatek in Tianjin.
| Jan 19, 2015
Gaudi’s first work outside Spain will be a chapel in Chile
Nearly 100 years after Antoni Gaudí’s death, Chile will begin constructing a chapel using his designs.
| Jan 19, 2015
Architecture for Humanity closes office, plans to file for bankruptcy
After more than 15 years of work, the nonprofit design group Architecture for Humanity has closed its San Francisco office and plans to file for Chapter 7 bankruptcy protection.
| Jan 17, 2015
When is a train station not a train station? When it’s a performance venue
You can catch a train at Minneapolis’s new Target Field Station. You can also share in an experience. That’s what ‘Open Transit’ is all about.
| Jan 16, 2015
Artsy lifeguard stations will brighten Toronto’s snowy beach
Five winning designs have been unveiled for lifeguard stands that will double as public space art installations on Toronto's beach.
| Jan 16, 2015
New York City construction costs continue to climb
A study released by the New York Building Congress shows that construction costs in Manhattan have risen 5% in each of the last two years.
| Jan 15, 2015
A reconstructed Taliesin West is the largest Frank Lloyd Wright LEGO Model [slideshow]
Artist Adam Reed Tucker used 180,000 LEGO pieces and 420 hours of work to recreate Frank Lloyd Wright's Taliesin West campus.
| Jan 15, 2015
Construction materials prices fall in November
Construction input prices dipped 1.4% during the final month of 2014 and are down nearly 1% on a year-over-year basis, according to the Jan. 15 producer price index release from the U.S. Department of Labor.